My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE53352
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE53352
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:56:49 PM
Creation date
11/20/2007 3:44:00 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1984062
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
EXHIBIT 26 PERMANENT OVERBURDEN STOCKPILE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Bob Liddle <br />G]aste Material and Spoil <br />-2- June 30, 1981 <br />The application has several deficiencies in regard to the disposition of <br />underground waste materials and overburden spoils. The application should <br />specifically discuss the underground waste material placement and compaction <br />specifications to be utilized. Plans and cross-sections of the backfilled <br />pit to receive waste material should be included within the application. <br />The applicant presents the opinion that the permanent overburden spoil pile <br />located in Section 24 predates the permanent regulatory programs inception <br />and is, therefore exempt. If the applicant does not redisturb that pile, <br />as the application proposes, I agree. The applicant should topsoil and re- <br />vegetate that pile as soon as possible in a timely manner. <br />The application also states the applicant's opinion that the regulatory <br />requirements of Rule 4.09 do not apply to temporary spoil piles, two of <br />which are contained within the application. The Division disagrees with this <br />opinion. The application should be amended to include discriptions of the <br />construction specifications as utilized during material placement within the <br />two piles, as well as cross-sections and plans for these temporary piles <br />located within Section 12. The applicant should conform with the requirements <br />of Rule 4.09. Division policy has been to consider variance from the required <br />long-term static safety factor requirements, if the applicant is not intending to <br />• redisturb the piles. If continued disturbance is proposed, the Division will <br />investigate the possibility of achieving conformance by selective placement <br />of additional material to reconfigure the slopes of the existing temporary <br />piles. Periodic inspections in keeping with Rule 4.09 will also be required <br />to assure maintenance of a safe condition during the piles life span. <br />Subsidence <br />The subsidence evaluation within the application has several major deficiencies <br />which must be eliminated by the applicant. First, the applicant's subsidence <br />prediction (exhibit 15) projects subsidence based upon extrapolation from <br />empirical graphs contained within a publication by Syd Peng. The applicant <br />utilizes this graphical information to project subsidence beneath "area A" <br />equivalent to 7X of the extracted seam thickness. "Area A" contains Foidel <br />and Middle Creeks. This presentation is inadequate. The applicant should <br />amend the application to include pillar stability ground control calculations, <br />which are described at length in the same publication by Syd Peng ("Coal Mine <br />Ground Control", 1978), from which the graphical techniques were excerpted. <br />Rny one of the normally acceptable techniques for roof stability calculation <br />may be applied to the task by the applicant. <br />Secondly, the applicant describes the existence of an approximately 200 ft. <br />wide fault zone, which constitutes the eastern boundary of the Middle Creek <br />underground mine plan. Faults comrtnnly influence the character of ground <br />subsidence above underground workings. A homogeneity assumptions implicit <br />in the normal graphical and mathematical subsidence projection techniques <br />. often do not apply in faulted situations. Subsidence can occur along existing <br />shear plains within the faulted zone, increasing the possiblity of discrete <br />
The URL can be used to link to this page
Your browser does not support the video tag.