Laserfiche WebLink
Temporary Subsulute Supply Plan - Une Camp Alonlezuma County. SEP 2004. Page 18 <br />2't04 r..ave shown that less watering has Ceen necessary, and therefore, an estimated average of 45 days {5 <br />each in Play. June, September and Ccrober. t0 in July, and 15 ~n August) is used. Areas wall vary Cased on <br />aaiwties. areas in use. e;c but use has generally bean t truckload (4000 gaucns} of water per day, and this is <br />used to estimate future consumption 9.55 acre-leetl year, over the six month period. <br />5. Summary o' Consumptive Use. Figure t shows annual corsumpGve use by months for the project through June <br />2004. Figures 1 anC 3 snow annual ~nsumptive use by months for the remaining hfe of the project <br />7. >Vater Consumed by Ponds after Reclamation. Beginning with the completion of re;,lamaUOn {sc.^:eduied for <br />2007-08), only the ponds wdt have a coosumpt!vre use of water, as shown for Water Year 2007-2008 m Figure 3. <br />Beyond ;hs point, consumpt;ve use is expected to remain at a constant level of 36.87 acredee; nth dry-up <br />providing 46.54 aae-feet and 9.67 acre-teat surplus for storageuse by DWCO. Of Ihis 9 67 acre-feet at least <br />5.0 aae-feet will Ce trans(ened to D'NCD ,r, payment for services. a minimum of C 6t a;,re•feet used to provide <br />`or releases in Apnl and f,1ay of the next year (shoulder months) and up l0 4.67 acredeet wJl be added to the <br />wafer stored, to maintain the available water stored at a level of at least 60 acre-feet to provide for potential <br />drought and other unforeseen circumsta^.ces <br />0.1 inches per day, no use of chemicals for dust con;ro!. ax assuming 100°~ loss to evaperaGon, water will be <br />applied 20 days in June, 14 days in July. t4 in August. ar,d 20 n September or 68 days <br />