Laserfiche WebLink
Temporary Substitute Supply Plan -Line Camp, Montezuma County, SEP 2004, Page 5 <br />b. 2003-2004 In the 2002-2003 period, following issuance of the CDOT accE:ss permit, the new access road and <br />intersection with CH 145 was constructed, and the actual mining of sand and gravel from the Line Camp Pit began in <br />2002, continuing into 2003. The total affected area increased from 6 acres to 9.5 acres, including 0.5 acres of <br />roadway, and 9 acres of stripped or bermed land. The irrigated land dried up was increased from 12.5 acres for the <br />2002 irrigation season, to 22.03 acres for the 2003 and 2004 irrigation seasons. An area of 1.25 acres was mined, <br />primarily above the water table. <br />Delays in 2001-2002 continued to delay mining that would otherwise have been done in this period. The area of open <br />water exposed (0.69 acres in October 2002), increased in April 03 to 1.1, in May to 1.24, in June to 1.65, and in July <br />2003 to 2.39 acres. <br />In the 2003-2004 period, mining continued. The affected area was increased from 9.5 to 12.6 acres, including 10 <br />acres stripped (but not mined and not exposing the ground water), 2.1 acres of berms/stockpiled stripped material <br />(again not exposing ground water), and 2.4 acres mined, of which a portion ~sxposed the ground water during at least <br />part of the year. Formally, 22 acres of land was dried up and its irrigation water available for replacement of <br />depletions; in addition, 6.9 acres was effectively dried up (due to blockage of the irrigation ditch) and its water also <br />availables. In the Spring 2004, work was done to improve the Home Ditch, <as requested by the Water <br />Commissioner, and to reduce transportation losses on the ditch itself. <br />During Water Year 2003-2004,mining operations are expected fo consume '12.78 acre-feet of water, white dry-up will <br />provide 32.20 acre-feet. (These are based on actual numbers through June 2004 and estimates for the remainder of <br />2004). Water immediately available from dry-up did not provide enough for consumption in Nov 2003 (0.34 acre-feet) <br />or March 2004 (0.32 acre-feet) and that amount (0.68 acre-feet} was provided by aggregated releases from <br />Groundhog Reservoir by MVIC per the agreement, leaving a balance of 19.;?0 acre-feet in Groundhog. future <br />releases are assumed to come from a new agreement with DWCD. A total of 32.20 acre-feet of surplus water from <br />dry-up Flowed downstream and is assumed to be available to DWCD per the new agreement with 4SA and the <br />Owner, to provide water to replace consumption from the pit (including the ponds) when the Home Ditch is not in <br />priority, and when consumption exceeds the water available from the dry-up during a given month. <br />Therefore, as of the end of Water Year 2003-2004, a total of 51.40 acre-feet (19.20 acre-feet in Groundhog and <br />32.20 acre-feet in McPhee) is presumed to be available at any time of year to provide water to replace consumption <br />by mining operations and the Line Camp ponds when water from Home Ditr:h in the same month is not available. <br />s Dry-up map submitted to WRD February 2004. This area is NOT included in the table above. <br />