Laserfiche WebLink
CONSTRUCTION MATERIALS APPLICATION <br />MLRB Presentation Form <br />December 16, 2003 ~' <br />GENERAL INFORMATION <br />File No.: M-2001-001 / Location: 9 miles NE of Dolores, <br />Applicant: Four States Aggregate, LLC 21944 Hwy 145, <br />Operation: Line Camp Pit a/' SW '/< of SE '/< of Sec. 22, <br />Application: Regular 112c T33N, R22W, NMPM, <br />Acreage: 22.6 Montezuma County. <br />Objections: Yes Specialist: Wally Erickson <br />~ ,L'bOQ~ <br />MINING PLAN ®~~'~ Q`x~sssa~~,~~,~~;t <br />~c!"~'" <br />Conventional excavation with on-site prgdessmg to include screening, washing, crushing and <br />production of concrete and asphalt products. Due to high water table, pit dewatering will be necessary. <br />The application indicates that a discharge permit through CDPHE-WOCD, and a well permit through <br />OSE-DWR, have been acquired. U.S. Army Corps of Engineers have inspected the site and have <br />indicated that permitting under Section 404 of the Clean Water Act is not required. <br />RECLAMATION PLAN <br />Final Land Use: Developed water resources and pastureland. <br />Slope Grading: Pond inslopes not steeper than 3H:1 V, 3 ponds resulting from excavations. <br />Topsoil Depth: 12" <br />Revegetation Mix: Meadow brome grass, Intermediate wheatgrass, Orchardgrass, Timothy, and <br /> Cicer milk vetch, mulch and fertilizer as necessary. <br />Other Details: Montezuma County has required that the applicant post $10,000 bond with <br /> the county to address landscaping commitments beyond the minimum <br /> requirements of the Act and Rules. <br />STAFF RECOMMENDATION <br />Staff has determined that the application demonstrates compliance with the requirements of C.R.S. 34- <br />32.5-115(4), and therefore recommend that the Board approve the Line Camp Pit application with two <br />conditions. Staff has estimated the total cost of reclamation at $91,917. Therefore, staff recommends <br />that financial warranty be set at $91,917. <br />CONDITION 1 Four States Aggregates, LLC (Four States) shall analyze at least one water <br />sample each from the existing pond at the Line Camp Pit and from the Dolores River upstream from the <br />Pit. Both samples shall be analyzed for all appropriate parameters. If the result for any parameter from <br />the pond sample exceeds that same parameter from the river sample, Four States shall immediately <br />