Laserfiche WebLink
~. • <br />Colorado Division of Minerals and Geology sheet 1 of 2 <br />ESTIMATING FORM - EQUIPMENT MOBILIZATION / DEMOBILIZATION <br />Last Update: <br />December. 1994 <br />Task #... 6 Prep. by RCO Filename..M089-6 <br />------------ ------- ---------- <br />Date..... 20-Feb-97 Permit # M-96.089 Mine......5koglund Pit <br />--- ---- ------------------------------------------------ <br />Permit Action........ Reclamation <br />Task Description..... Mobilize reclamation equipment from Saguache <br />HOURLY EQUIPMENT COST <br />NOTE - This is a list to select from. not a list of mandatory items to include. <br />Mob/Demob Eqp. -Tractor 6x4. 75,000 lb GVW, 375 HP. diesel powered <br />-Lt. Trailer 25 ton folding gooseneck. drop deck <br />-Med. Trailer 50 ton folding gooseneck. drop deck <br />-Hvy. Trailer 120 Ton folding gooseneck, drop deck <br />-Pilot Car On-highway light duty truck. 4x2. 130 hp. 1/2 ton rating. gasoline powered <br />-Hyd. Crane Grove RT58D rough terrain hydraulic crane. 20 ton capacity. 125 hp. 60 ft. boom <br />-Fuel Truck 6x4. 3,600 gallon capacity, 210 HP. diesel powered <br />-Cube Truck 6x4, 2.500 gallon capacity. 210 HP, diesel powered <br />-Flatbed Truck: 20.000 lb GVW. 115 HP. diesel powered <br />--------------- <br />Cost Breakdown: Lt. Rig <br /><=25 T. Med.Rig <br />26-50 T. Hvy. Rig <br />> 50 T. Pilot <br />Car Hydraulic <br />Crane Fuel <br />Truck Lube <br />Truck Flatbed <br />Truck <br />Ownership Cost/hr = 527.88 531.23 538.36 51.81 519.89 56.95 512.79 55.71 <br />Operating Cost/hr = 526.84 529.29 534.27 55.12 523.40 518.53 524.52 58.00 <br />Operator Cost/hr = 521.40 522.03 522.03 521.24 120.86 521.24 521.24 121.24 <br />Helper Cost/hr = 520.60 521.24 521.24 50.00 50.00 50.00 50.00 50.00 <br />Total = 596.72 <br />------ 5103.79 <br />------ 5115.90 <br />------- 528.17 564.15 546.72 ~ 558.55 534.95 <br /> <br />NON-ROADABLE EQUIPMENT: ------ ------ ------ ------- ------ <br />-------------------- - Weight Ownership Haul Rig Fleet Size Haul Trip Return Trip DOT Permit <br />Machine Description (tons) Cost/hr Cost/hr (no. hauled) Cost/hr Cost/hr Cost/ea <br />Cat D8N w/ ripper 40.00 546.68 5103.79 1 5150.47 5103.79 50.00 <br />Farm tractor w/reveg equipmt 10.00 520.00 596.72 1 5116.72 596.72 50.00 <br />Subtotals 5267.19 5200.51 50.00 <br />