Laserfiche WebLink
<br /> <br />floodway, exclusive of the flood fringes (a condition that will not occur). The maximum <br />velocities during either of these events are l feedsecond and 2 feedsecond, respectively. <br />Since the velocities remain quite low, the opportunity for erosion of the pit bank areas to <br />impact the Cache la Poudre River is negligible. Therefore, no special attention needs to <br />be made relative to the banks. Any mining operation protection that needs to occur <br />within the mine area should be looked at by the operations people. <br />If you have any questions about this information, please contact me. <br />Sincerely, <br />PICKE7T ENiGINEERIHG. INC. <br />P.E. <br />KAP/jz <br />enclosures <br />cc: Connie Nickle Davis, Aggregate Industries <br />