My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO23281
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO23281
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:43:51 PM
Creation date
11/20/2007 3:40:50 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Hydrology
Doc Date
9/25/1995
Doc Name
WEST ELK MINE PN C-80-007 CONTINUED INSTALLATION OF SURFACE WATER DISTRIBUTION LINES AND REPAIR OF S
From
MOUNTAIN COAL CO
To
DMG
Permit Index Doc Type
CORRESPONDENCE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mountain Coal Company <br />West Elk Mine <br />Post OKce Boz 591 <br />Somerset, Colorado 91434 <br />Telephone 970 929-5015 <br />Fax 970 929-5595 <br />September 21, 1995 <br />Ms. Christine E. Johnston <br />R1=1^.FivED <br />SEP 2 5 1995 <br />Division or rvnnerals ~, ueoloy~ <br />DIVISION OF MINERALS AND GEOLOGY <br />Office of Mined Land Reclamation <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />iii iiiiiiiiiiiii iii <br />999 <br />~~ <br />Re: West Elk Mine, Permit No. C-80-007, Continued Installation of Surface Water <br />Distribution Lines and Repair of Small Slump <br />Dear Christine: <br />As you know, Mountain Coal Company (MCC) has completed installation of the surface pipelines <br />from the freshwater pond and water treatment plant into the mine and to the potable water tank, <br />respectively. Construction continues on the surface potable water pipelines to the office building <br />and to the warehouse level. An as-built of the surface pipeline water distribution system will be <br />provided upon completion of this portion of the project to verify that sufficient bond for <br />reclamation is in place. <br />A small slump developed late this spring in the southwest area of the materials storage bench cut <br />slope. To repair the area, MCC will grade the slump material so that any surface water will drain. <br />A notch will be cut through the slump area to aid in draining the material. A four-inch drain pipe <br />will be set at the bottom of the notch to direct any flows to ditch D2-6A at the base of the cut <br />slope. <br />Please contact me should you have questions. <br />Sincerely, <br />~~~u~~ <br />Kathleen G. Welt, <br />Environmental Supervisor <br />cc: Henry Barbe <br />Norm Every <br />John Poulos <br />Phil Schmidt <br />
The URL can be used to link to this page
Your browser does not support the video tag.