Laserfiche WebLink
CIRCES Cost Estimation Software <br />Task # : 001 <br />Date : 0&/13/2005 <br />User : GRS <br />State :Colorado Pennit/job# : M-2005-032 <br />County :Washington Abbreviation :none <br />Site :Sprague Scraper Service Pit Filename :M032-001 <br />Agency or organization name :Colorado Dmg <br />Permit or otherjob action :New Application <br />Task descdption :Spread overburden and <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat 08R Series 11 <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 : NA <br />Shift basis : 1 per day <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $44.24 NA <br />Operating costfhour ; $61.43 100 <br />Ripper op. cosUhour : $0.00 NA <br />Operator cost/hour : $24.01 NA <br />Total unit cosUhour : $129.68 Total fleet cosUhour : x129.68 <br /> <br />MATERIAL QUANTITIES . . ;:: .. <br />Initial Swell Loose <br />volume : 16,000 LCY factor : NA volume : 16,000 LCY <br />Source of estimated volume : Ex. L <br />Source of estimated swell factor:NA <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br />Average push distance : 200 feet <br />Unadjusted hourly production : 491.9 LCY/hr <br />Material consistency description <br />Consolidated stockpile <br />Average push gradient : 10.00 <br />Average site altitude : 4,000 fey <br />Material weight : 2,550 Ibs/LCY <br />Weight description <br />Earth - Dry packed <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) <br />Unit cost : $0.479 /LCY <br />8SU Horsepower : 310 <br />Operator skill : 0.75 <br />Material consistency : 1.00 <br />Dozing method : 1.00 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.80 <br />Push gradient : 1.22 <br />Altitude : 1.00 <br />Material weight : 0.90 <br />Blade type : 1.00 <br />Net correction : 0.55 <br />Adjusted unit production : 270.66 LCY/hr <br />Adjusted fleet production : 270.66 LCY/hr <br />Total job time : 59.11 Hours <br />Total job cost : $7,666 <br />