Laserfiche WebLink
n <br />LJ <br />a different channel slope. The entire length of the ditch is designed <br />as a triangular shaped, vegetated channel with 2N:lY sideslopes. The <br />design flow to Sections A, B and C is equal to 2.2, 3.6 and 4.8 feet per <br />second, respectively. Therefore, no erosion protection is required. <br />However, rock riprap (D50 ~ 8 inches) will be placed in Section C where <br />it joins with the north collection ditch to prevent erosion at the <br />channel bend. The riprap will be placed to an approximate depth of 18 <br />inches along the channel bottom and sideslopes. Appropriate bedding <br />material will be placed and spread prior to riprap placement. Design <br />details for each channel section are summarized by Figure 3. Design <br />Detail - Refuse Collection Ditches. <br />North Refuse Collection Ditch <br />The north refuse collection ditch extends along the northern toe of the <br />refuse storage pile. This ditch collects all surface drainage flowing <br />• off the north slope of the pile, in addition to flow contributions from <br />the west collection ditch, and conveys it to Sediment Pond 4. The north <br />collection ditch is divided into three (3) sections as shown on figure <br />1, Refuse Disposal Area Drainage Plan. Each section has the same <br />channel slope but different channel configuration. <br />Section A is designed as a trapezoidal channel with a 5-foot bottom <br />width and 2H: 1V sideslopes. The channel section extends approxi~ately <br />750 feet at a 3.6 percent slope. The design velocity is 4.8 fps, <br />therefore, no erosion protection is required for this section. <br />Section B is designed as a trapezoidal channel with an 8-foot bottom <br />width and 2N:1Y sideslopes. The channel section extends for <br />approximately 340 feet at a 3.6 percent slope. The design velocity is <br />5.0 fps, therefore. no erosion protection is required for this section. <br />Section C is designed as a trapezoidal channel with a 2-foot bottom <br />• width and 2H:1V sideslopes. The channel section extends approximately <br />420 feet at a 3.6 percent slope. The calculated velocity (6.2 fps) <br />-14- <br />