My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO23224
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO23224
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:43:50 PM
Creation date
11/20/2007 3:37:25 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996084
IBM Index Class Name
Hydrology
Doc Date
9/25/2006
Doc Name
2nd Quarter 2006 Sediment Pond Inspection Reports
From
Peak Project Management, LLC
To
DRMS
Permit Index Doc Type
Sediment Pond Inspections
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
QUARTERLY SEDIMENTATION POND INSPECTION REPORT <br />CDMR Rule 4.05.9(17) <br />Mine: LorenCito <br />NPDES ID. No.: <br />Inspection Period: <br />Inspection Date: <br />Pond #6 <br />Second Quarter 2006 <br />6/12/06 <br />General Description or Reference to Site Plan: <br />This pond is located South of the area of mining scheduled for 2001-02. The pond <br />is partialty incised into bedrock and the embankment keyed into bedrock. <br />Side slopes are less than 2H:1 V. The primary discharges south into Jeff Canyon drainage. <br />EMBANKMENT <br /> <br />1). Adequacy of the vegetative cover. Excellent oder at Few Poor <br />2). Erosion forming Gullies: Extensive Some ew None <br />3). Is wave action pusing erosion: <br /> On the Upsfream embankment? Yes No (, <br /> At the principal spillway inlet? Yes No <br />4). Erosion of the downstream toe of the embankment? Yes No ~ <br /> Cause of erosion can be attributed to: <br />5). Is seepage occurring through the dam? Yes No ~ <br /> Could this seepage cause potential instability/? <br /> <br />PRINCIPAL SPILLWAY <br />1). Is the principal spillway system in working order? <br />2). Is the inlet free of debris and restrictive material?. <br />3). Is the discharge outlet free of restrictive material? <br />4). Is erosion occurring at the discharge outlet? <br />Evaluate the severity: Extensive Moderate <br />Yes / No <br />Yes ~ No <br />Yes ~/ No <br />Yes No ~ <br />Just starting None <br />Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.