Laserfiche WebLink
f <br />OFFICE OF THE STATE ENGINEER <br />Division of Water Resources <br />Department of Natural Resources <br />1313 Sherman Street, Room 818 <br />Denver, Colorado 80203 <br />Phone (303)866-3581 <br />FAX (303) 866-3589 <br />http://vwiw.water. state.co. us <br />DATE: February 26, 2007 <br />~, c~ w <br />STATE OF COLORADO <br />RECEIVED <br />-~EB 2 6 2001 <br />/.OF <br />,0 a~B <br />l~l~>~ ~a <br />•~r,~ ° ;~ <br />.~/. <br />~\,a~s` <br />Divisio f Reclamation, <br />ing and Safety <br />TO: David A Bird, Environmental Protection Specialist <br />CC: Division 2 Office; District 19 Water Commissioner <br />FROM: Clay Kimmi, P.E. <br />RE: Mooney Hills Permit, File No. M-2007-007 <br />Operator: Mullet Excavating <br />Contact: Myron Mullet (719) 783-2056 <br />Section 25, Twp 32S, Rng 62 W, 6th P.M., Las Animas County <br />Bill Ritter, Jr. <br />Governor <br />Hams D. Sherman <br />Executive Director <br />Hal D. Simpson, P.E. <br />State Engineer <br />CONDITIONS FOR APPROVAL <br />® The proposed operation does not anticipate exposing groundwater. Therefore, exposure of ground <br />water must not occur during or after mining operations. If stormwater is contained on-site, it must <br />infiltrate into the ground or be released to the natural stream system within 72 hours, or all work <br />must cease until a substitute water supply plan, or augmentation plan approved by water court, is <br />obtained. Reclamation plans must ensure water will not be retained onsite for more than 72 hours <br />unless an augmentation plan approved by water court is obtained. <br />^ The proposed operation will consume ground water by: ^ evaporation, ^ dust control, <br />^ reclamation, ^ water removed in the mined product, ^ processing, ^ other:. <br />Prior to initiation of these uses of ground water, the applicant will need to obtain either a gravel pit <br />or other type of well permit, as applicable. However, prior to obtaining a permit, an approved water <br />supply plan or decreed plan for augmentation is required. <br />^ Prior to approving a well permit, the applicant must conduct a field inspection of the site and <br />document the locations of all wells within 600 feet of the permit area. The applicant must then <br />obtain a waiver of objection from all well owners with wells within 600 feet of the permit area or <br />request a hearing before the State Engineer. <br />^ Other: <br />~MMENTS: <br />