My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO23170
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO23170
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:43:48 PM
Creation date
11/20/2007 3:34:52 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Hydrology
Doc Name
MOUNTAIN COAL CO WEST ELK MINE - SOMERSET COLO STORM WATER POLLUTION PREVENTION PLAN JULY 1993
Permit Index Doc Type
OTHER GROUND WATER
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Mountain Coal Company SPCC Plan <br />Wesrt Elk Mine February 1993 <br />7]I. PETROLEUM PRODUCT STORAGE AREA DRAP1IAGE <br />Drainage of accumulated precipitation from bermed storage azeas will be minimal <br />- because of the roof and three wall system at the petroleum product unloading and <br />storage azea. <br />- ,.~ .. Drainage of precipitation from the containment bunker onto the ground is <br />performed following careful visual inspection of the azea. If any sign of oil <br />contamination is detected, drainage will be postponed until the contamination is <br />removed. Environmental Personnel will be contacted by field personnel prior to <br />' - . drainage. . <br />Drainage of containment berms will be recorded in Appendix F of this plan by <br />Environmental Personnel. <br />N. PETROLEUM PRODUCT FACILITY Ii'SPECTIONS - <br />;' ...\ <br />Periodic visual checks aze made by field personnel to detect corrosion and <br />' deficiencies. Annual visual inspections of all above-ground tanks (including tank <br />supports and foundations), pipelines, and valves are performed and the results are <br />recorded in Appendix G of this SPCC Plan.. Inspections will be done~v the <br />.Engineering Department, with appropriate technical personnel assisting. These <br />. inspections will be performed on an annual basis during the month of August. <br />V. SECURITY `-----..---------~-- <br />Fencing surrounding the active mine site controls access. <br />VI. TRAI\i1T,\G <br />All new personnel will be briefed on the SPCC Plan. The SPCC Plan will also <br />be periodically reviewed. A copy of this SPCC Plan will be retained at the <br />Environmental Office, Safety Office, and the Wazehouse. <br />:; <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.