Laserfiche WebLink
~~ <br /> <br />RECLAMATION COST SUMNART coot ~d sheet 3 of 4 <br />H. EARTHWORK -STREAM CHANNEL RECONSTRUCTION <br />Task No.l Task Description I Cost (S) <br />________ I __________________________________________________ I ____________ <br />I I <br />I I <br />I I <br />I I <br />------------------------------------------------------------------------ <br />Subtotal (H): <br />I. EARTHWORK -DRAINAGE CONTROL SYSTEM INSTALLATION/REMOVAL <br />Tesk No.l Task Description I Los[ (S) <br />________ I __________________________________________________ I ____________ <br />I I <br />I I <br />I I <br />I I <br />I I <br />I i <br />Subtotal (1): <br />____________ <br />J. EARTHWORK -TOPSOIL/SUBSOIL REPLACEMENT <br />Task No.l Task Description I Cost (S) <br />__________ I ____________ <br />4 I Redistribute Topsoil on Dri llpads 8 Access Roads I 52,187 <br />I ~ <br />I ~ <br />I I <br />I I <br />I I <br />Subtotal (J): 52,187 <br />