My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE53054
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE53054
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:56:37 PM
Creation date
11/20/2007 3:34:14 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
X199621900
IBM Index Class Name
Permit File
Doc Date
2/8/1996
Doc Name
Incompleteness/Adequacy Letter
From
DMG
To
WHITEWOOD GEOLOGIC GROUP INC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />ROADABLE EQUIPMENT: <br />---------------- Total Eqp. Fleet Size Haul Trip Return Trip <br />Machine Description <br />a_____ Lost/hr (no. hauled) <br />_________ Los[/hr <br />___ <br />_______ Los[/hr <br />_____________ <br />_________________ <br />________ <br />D riLL Rig ___________________________ <br />5125.00 ___________ <br />1 __ <br />5125.00 5125.00 <br />Pater Truck 537.02 1 537.02 537.02 <br />Flatbed Truck 535.07 1 535.07 535.07 <br />Pickup Truck 529.37 1 529.37 529.37 <br />sheet 2 of 2 <br />subtotals 5226.46 5226.46 <br />MOB/DEMOB SUPPORT EOUI PMENT: --------- --------- <br />__~____-______~__-_______ Neight Ownership Haul Rig Fleet Size NauL Trip Return Trip DOT Permit <br />Non-Roadable Eqp. Description (tons) Cost/hr Cost/hr (no. hauled) Cost/hr Cost/hr Cost/ea <br /> <br />Subtotals 50.00 50.00 50.00 <br />Total Eqp. Fleet Size Haul Trip Return Trip <br />Roedable Eqp. Description Cos[/hr (no. hauled) Cost/hr Cost/hr <br />_______________________________________________________________________________________________________ <br />Subtotals 50.00 50.00 <br />EQUIPMENT HAUL DISTANCE 8 TINE <br />Nearest major city or town within project area region: hayden <br />_______________________________________________________ <br />Total one way travel distance = 10.0 miles. Average travel speed = 30.00 mph. <br />_____- _____________ <br />Job Time - Non Roedable Equip.= hours load Roadable Equip.= N/A hours load <br />0.33 hours haul 0.33 hours haul <br />hours unload N/A hours unload <br />0.33 hours return 0.33 hours return <br />JOB COST Total Mob/Demob Cost = 5339.12 <br />_________ _____________ <br />_________ _____________ <br />NOTE: Non-roadable equipment (haul rig required to transport) mob/demob costs based on 2 round trips, each trip <br />consisting of a one-way loaded haul and a one-way e~ty return. Roadable equipment (no haul rig required) <br />costs based on one round trip. Colorado DOT requires special permits for oversize equipment on certain <br />specified road segments within the State. Separate permits are required for each rig on each loaded trip. <br />Additionally, pilot cars (one or two per rig depending on degree of oversize) are also required for oversize <br />equipment hauling, and loading/unloading times mist be increased substantially for equipment which must be <br />partially dismantled far transport and re-assembled at the job site. Costs for lifting equi Anent and other <br />support equipment needed for this work should be included in the mob/demob costs. <br />
The URL can be used to link to this page
Your browser does not support the video tag.