Laserfiche WebLink
NA TER TBUCB COST DATA MOR8SH8BT cont'd <br />...................................... <br />OPBRATOH MACES <br />Lahor Classification Zone Designatron Base Rate <br />TrucM Oper, -No Puddling Zone A <br />Znne B <br />TrucB Oper. -Puddling Req. Zone A <br />Zone B <br />Nechanic Zone A <br />Zone B <br />ACeU[SIT[ON COST: <br />313.18 <br />913,68 <br />513,23 <br />!13,73 <br />514.T1 <br />515.21 <br />Sheet 2 of 2 sheets <br />Fringe R.[.C.R <br />Benefits 10,07701 <br />43.49 S1.U1 <br />f3.49 lI,OS <br />43,49 51.02 <br />53.49 51,06 <br />13.49 Sl.l3 <br />53.49 51,17 <br />Base purchase price (C8CU1 547,061.94 <br />Less dealer discount (CBCC @ 3.4X1 51,800.11 <br />Plus freight (CBCC @ 1.5X1 5705.93 <br />Plus dealer charges (assuae .3X1 5141.19 <br />Adjusted purchase price 546,308.95 <br />Plus taxes: State sales @ 3X 51,389.27 <br />SMH @ 2S 5926.18 <br />Less fire cost (C8CC1 52,T29.S9 <br />Less salvage value (CBCC @ 17.6X1 58,150.37 <br />.............. <br />N8T AC6UISITION COST $37,744.43 <br />COST SUNMABY <br />Unenpl. <br />10.062) <br />SU.82 <br />SO.SS <br />10.82 <br />40.85 <br />40.91 <br />40.94 <br />Ak.Coop. <br />(0.1'lSl Total <br />51.65 S2U.1S <br />f1.71 4'10,78 <br />f1.ES S2U.21 <br />51.72 S'1U.84 <br />51.84 422.08 <br />51.90 f'd't.72 <br />Shift Differential ISlhr) ii <br />......................... <br />Day shift: SU.UI <br />Suing shift: 50.31 <br />Graveyard shift: SU.4 <br />'l shift/day avg. SU.I`. <br />3 shiftlday avg. 30.2; <br /> BtNGLE SH[FT ROUBLE SH[ET TR[PL8 SHIFT <br /> BAS15 BASIS BASL S <br /> Zone A Zone B Zone A Zone B Zone A Zone 8 <br />Ownership Cost/Hr: 58,63 58,63 35.66 95.66 54.67 44.67 <br />Operatisg-Overhaul Cost/Hr: 97.52 f7.SS 97.52 S7,SS 97.52 97,55 <br />Operator Cost/Hr: 320.21 <br />------- S'1U,89 <br />- 320,36 lZU.99 <br />---- 9'10,46 921.09 <br />-- <br />TOTAL COST/HR - <br />536.36 - <br />------ <br />437.03 ------- <br />333.54 --- <br />534.20 ------- <br />932,65 ----- <br />933.3! <br />