Laserfiche WebLink
Roadable equipment: sheet 2 of 2 <br />" " " " " " "" " Total Eqp. Fleet Siee Naul Trip Re[urn Trip <br />Machine Description <br />----------------------------------- Cost/hr <br />----------------------- (no. hauledl Cost/hr <br />-------------------------------- Costlhr <br />------------- <br />----------------------------------- <br />2,500 gal On-hxy kater Tanker ----------------------- <br />437,03 -------------------------------- <br />I lJ7.U3 ------------- <br />J37.03 <br />Fuel Truck 54'1.14 1 542.14 542,14 <br />Luba Truck 551.11 I 351.11 451,11 <br />Ptckup Truck f31.U2 l f31.U2 S31.OY <br />Crove RT-475 Hydraulic Crane 558.97 I 958.9" 958.9' <br />• <br />• <br />HOB/DEMOB SUPPORT 66UIPHENT. <br />" "" " " " " " " " " " "' Height Oxnership Haul Big Fleet Stee Haul Trip Return Trip IiOT Perntt <br />Non-Roadable Eqp. Description (tons Cost/hr Cost/Lr (no. hauledl Cost/hr Cost/hr Cost/ea <br />------------------------------------------------------------------------------------------------------- <br />------------------------------------------------------------------------------------------------------- <br />Subtotals f220,27 (220.27 <br />None Required <br />Subtotals <br />Total Bqp. Fleet Siee Haul Trip Beturs Tr p <br />Roadable Bqp. Description Cos[/hr (no. hauled( Costlhr Costlhr <br />------------------------------------------------------------------------------------------------------- <br />None Required <br />Subtotals <br />......... ......... <br />EBUIPNENT NAUL DISTANCE d TIRE <br />------------------------------ <br />------------------------------ <br />Nearest major city or torn xithin project area region: Grand Junction <br />Total one xay travel distance = 120.0 <br />...... miles. Average travel speed = <br />.. 45.00 <br />........... mph, <br />Jot Time - Non Roadable Equtp.= ].00 hours load Roadable Equip.= G/p hours load <br />2.67 hours haul '1.67 hours haul <br />I.00 hours unload N/A hours unload <br />'1.67 <br />------- hours <br />------ return <br />-------- 2.67 <br />------- hours <br />------ return <br />------- <br />JCB LOST <br />Total Hob/Demob Cost = f13,108.U4 <br />NOTE: Non-readable equipment (haul rtg required to transports mob/demoh costs based on E round trios, each trip <br />consisting of a one-way loaded haul and a one-way zmpty return. Roadable equtpment (nu haul ng required) <br />costs based on nnz round cn p. Colorado DOT requires soecial permits Cor oversise equioment on certain <br />specified road segnents within the State. Separate petits are required for each rtg on each ii~aded trip. <br />Additionally, pilot cars lone or two per rig depending on degree of oversiee) are also reoutred for overstez <br />equipment hauling, and loadinglunloading times must be tncrzased substantially for equipment which must be <br />partially dismantled for transport and re-assembled at the lab site. Costs fur iifting =gcipaznt and artier <br />suppo rt equipment needed for thts work should be included in the mcbldemob casts. <br />