Laserfiche WebLink
HOURLY PRODUCTION: <br />Scraper Cycle Time <br />Load - 4111142" min <br />Maneuver & spread = 0.7 min. <br />Travel time (haul & return): <br />Job Condition Correction Factors <br />Site altitude = 5800 ft. <br />Alt. adjustment .. 1 <br />Job efficiency ... 0.83 (lsh/d; <br />Net Correction 0.83 <br />kiaul route <br />Road Length Grade Rolling Total Velocity Travel time* <br />seg. # (ft) res.(%) res.(%) res.(%) {fpm) (min) <br />1 500 2.00 5.00 7.00 936 0.66 <br />Haul time = 0.66 min. <br />Return route "`" " "`""" <br />1 50U -2.00 5.00 3.00 2882 0.40 <br />*lst & last seg. adj. for accel./decel. Return time = 0.40 <br />Total Cycle Time = 2.96 min. <br />Machine"Payload <br />Material Height = 2650.00 lbs/LC]' <br />Mat. description """"""" <br />Decomposed rock- 25% Rock, 75% Earth <br />Rated payload = 75,000 lbs. <br />Payload volume = 28.30 LC ]' <br />min. <br />Machine"Volume <br />Struck capacity = <br />Heaped capacity = <br />Average = <br />Adjusted volume = <br />Unadjusted production per scraper or push-pull pair <br />Adjusted production <br />Adjusted hourly fleet. production <br />21.00 <br />31.00 <br />-- <br />26.00 LG]' <br />26.00 LC]' <br />' JO8 COST: <br />Fleet size 1 Scraper(s) Total Job Time <br />Unit Cost X0.504 /LCY Total Job Cost. <br />527.11 LC ]'/hr <br />437.50 LC]'/hr <br />437.50 LC ]'/hr <br />11.01 Hours <br />X2,426 <br />