Laserfiche WebLink
Pegs ? of 3 <br />ASSESSMENT CONFERENCE RCPORT <br />• (continued) <br />1. No i of V+ola +on/Cessation order No. 79-V-5-le <br />Violation ~ of 3 <br />failure to and maintain a railroad siding and <br />(a) Nature of violation loadout facility to control dimunition or degradation <br />o va er qua ,y an quan y an nt additions: <br />(b) Oate of termination contributions of suspended solids to streemflou. <br />Proposed Conference <br />(2) Conference Result Assessment Assessment <br />(a) History/Prey. Vio. (30) NOne <br />(b) Seriousness (30) <br />(1) Probability of <br />Occurrence (15) t5 t5 <br />Extent of <br />namage (t5) 9 9 <br />(2) Obstr. to Enforcement (15) <br />(c) Negligence (25) 21 21 <br />(d) Good Faith (-10) <br />_tn <br />Total 45 35 <br />• 3. "arrative: <br />(Brief explanation of reasons for any changes made in as si gnmant of <br />points and any additional information that vas presented at the <br />conference.) <br />The company commenced the remedial actions prescribed by the Inspector <br />immediately. This activity was completed as nuickly as the construction <br />could be done. Additionally, the company has Rone beyond the measures <br />prescribed by the inspector. A much more elaborate sediment control <br />scheme has been designed, approved, and constructed. For this reason, an <br />award of -10 has been made in the category of good faith. <br />• <br />