Laserfiche WebLink
~- . iii iiiiiiiiiiiiiiii <br />V~ , B99 <br />t <br />MINED LAND RECLAMATION DIVISION <br />Department of Natural Resources <br />7313 Sherman St.. Room 215 <br />Denver, CO 80203 <br />303 666-3567 <br />FA x. 303 832-8106 <br />pF COO pp <br />„~~~M ~O <br />..~ a <br />•.~'i <br />X9'!6' <br />Roy Romer. <br />Goverror <br />Fretl R Bama. <br />D~ns~on D~reaor <br />February 28, 1990 <br />Mr. Scott Wagner <br />High Plains Stone Company <br />P.0. Box 100 <br />Castle Rock, Colorado 80104 <br />Re: File No.: M-90-016, South 40 Quarry, Incomplete Application <br />Dear Mr. Wagner: <br />Upon reviewing your application fora Mining 8 Reclamation Permit, received <br />February 16, 1990, we have determined that it is incomplete under the Colorado <br />Mined Land Reclamation Act (C.R.S. 34-32-101, et seq.), and the associated <br />regulations. <br />The following items must be submitted in order for the application to be <br />considered filed (Rule 1.1(10) of the Rules and Regulations of the Mined Land <br />Reclamation Board, as amended, effective July, 1978): <br />Acreages of federal and state land affected <br />operation should be provided. Also, please <br />boundaries and the proposed permit area are <br />combined area does not exceed 9.8 acres. <br />by the proposed mining <br />confirm that the lease <br />identical, and that the <br />2. Rule 3.2 (1)(f) requires that a map showing sufficient information <br />to determine the locatidn of the affected land in connection with <br />the mining operation be provided. Names of all immediately <br />adjacent surface owners of record shall also be shown. The <br />boundary between state and federal land (BLM) could not be <br />discerned from the general location map (Exhibit E). A revised map <br />should be provided which addresses the requirements of Rule <br />3.2(1 )(f ). <br />3. Rule 3.2 (1)(h) requires that information be provided to describe or <br />identify the type of mincing operation proposed and how it will be <br />conducted. The mining plan as presented in the application does <br />not clearly describe how the operation will be conducted. We <br />suggest that you provide a discussion of the mining equipment and <br />methods to be used, configuration of the quarry and timeframes or <br />phases of the operation. We also suggest you provide a mining plan <br />map which includes the direction of mining, anticipated <br />disturbance, and various phases of the operation. <br /> <br />STATE OF COLORADO <br />,~ <br />