Laserfiche WebLink
iii iiiiiiiiiiii iii <br />U, <br />/~ L. <br />E~~A <br />s Coal Company Seneca Coal Company <br />RECEIVED <br />April 2, 1998 ppR 06 1998 <br />Division of Minerals & Geology <br />Ms. Erica Crosby <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203-2273 <br />RE: Seneca II Mine (C-80-005) Quarterly Stockpond Inspections <br />Dear Ms. Crosby: <br />Enclosed are copies of the first quarter stockpond inspections <br />for those structures at Seneca II which have been constructed to <br />date. The 'as-built' certifications for those stockponds which <br />do not already have an existing 'as-built' report or which have <br />been modified from the original will be submitted to the <br />Division by May 1st. Most of the stockponds appeared stable and <br />acceptable. Several have filled with sediment from the storms we <br />had in September and from runoff that will continue in the next <br />few weeks. We will clean these stockponds out in the spring when <br />the weather and ground conditions allow. <br />Should you have any questions, please do not hesitate to call. <br />P.E. <br />Enclosure(s) <br />c: Dennis Jones (SCC) <br />Gary Wendt (PWCC) <br />r+rrc u 2 1998 <br />Seneca Coal Company • P.O. Drawer D • Hayden, Colorado 61639 <br />Telephone (970) 276-3707 • FAX (970) 276-3014 <br />