Laserfiche WebLink
iiiiiiiiiiiiiiuiii <br />STATE OF COLORADO <br />OFFICE OF THE STATE ENGINEER <br />Division of Water Resources <br />Department of Natural Resources <br />1313 Sherman Street, Room 818 <br />Denver, Colorado 80203 <br />Phone: 1303) 866 3581 <br />FAQ: (303) 866-3589 <br />=ECEIVEL <br />OF.~~]O <br />4 <br />n ~ O <br />.`~~. <br />~f <br />~ /8]6 ~ ~ <br />MAR 15 1999 <br />„ ~ ~,t ^dinerals 8 Geology <br />hllpl/water stafe.co.us/defauh.hlm <br />Response to Reclamation Permit Application Consideration <br />DATE: March 12, 1999 <br />Bill Owens <br />Governor <br />Greg E Walche~ <br />Execmive Director <br />Hal D. $~mpson, P.E. <br />Slate Engineer <br />TO: James C. Stevens, Senior Environmental Protection Specialist <br />CC: Division 2 Office; District 67 Water Commissioner; Bill Fronczak <br />FROM: Kathleen L. Sullivan <br />RE: Patty's Pit, File No. M-98-103 <br />Operator: Homer Monks Construction, <br />Contact: (719)775-2328 <br />Section 29, Twp 9 South, Rng 57 West, 6th P.M., Elbert County <br />CONDITIONS FOR APPROVAL <br />® The proposed operation does not anticipate exposing groundwater. Therefore, exposure of ground <br />water must not occur during or after mining operations. <br />^ The proposed operation will consume ground water by: ^ evaporation, ^ dust control, ^ <br />reclamation, ^ water removed in the mined product, ^ processing, ^ other:. <br />Prior to initiation of these uses of ground water, the applicant will need to obtain either a gravel pit <br />or other type of well permit, as applicable. However, prior to obtaining a permit, an approved water <br />supply plan or decreed plan for augmentation is required. <br />^ Prior to approving a well permit, [he applicant must conduct a field inspection of the site and <br />document the locations of all wells within 600 fee[ of the permit area. The applicant must then <br />obtain a waiver of objection from all well owners with wells within 600 feet of the permit area or <br />requests hearing before the State Engineer. <br />^ Other: <br />COMMENTS: This operation is located in the Upper Big Sandy Designated Ground Water Basin. <br />If stormwater runoff is intercepted by the operation, and is not diverted or captured in priority, it must be <br />released to the stream system within three days. This may require a discharge permit from CDPHE- <br />WQCD. Otherwise [he operator will need [o make replacements for evaporation. <br />The applicant may contact the State Engineer's Office with any questions. <br />