My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO23076
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO23076
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:43:44 PM
Creation date
11/20/2007 3:31:02 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Hydrology
Doc Date
7/12/2007
Doc Name
June 2007 Monthly Report
From
Battle Mountain Resources, Inc.
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />o <br />)1_ ~~ ' BATTLE MOUNTAIN RESOURCES, INC. <br />Jnly o9, zoo7 <br />Mr. Allen Sorensen '`~~~ € <br />State of Colorado v I~U~ j `~ ZQ07 <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 pivision of <br />Denver, CO 80203 ~ Mining a <br />Re: Battle Mountain Resources ln~ <br />San Luis Project <br />C LRB Permit No. M-88- <br />une 2007 Monthly Report <br />Dear Mr. Sorensen: <br />The following summazizes monitoring and site activities at the Battle Mountain Resources Inc. <br />(BMRI), San Luis Project for the month of June 2007. <br />Surface and ground water monitoring and analysis were completed for all required sites during <br />the month per the terms and conditions of the TR-32 Quality Assurance and Quality Control <br />(QA/QC) plan. <br />Vacuum on the [ailing lysimeters was verified on June 28`", no water was present for sampling <br />and subsequent analysis. <br />Depths to water were collected for the tailing impoundment main embankment piezometers and <br />the West Pit monitoring wells on June 27's. June tailing impoundment piezometer measurements <br />identified these installations were either dry or contained less than 12 inches of water as <br />illustrated in Table 2. Tables 1 and 2 below identify the depth to water measurements collected <br />for each of the site monitoring wells, piezometers and lysimeters as required by the terms and <br />conditions of the TR-32 QA/QC plan. <br />The tailing impoundment collection pond underdrain flow was pumped intermittently during the <br />month to minimize the collection pond level. The Teak detection system was measured on June <br />28`s. The June tailings pond underdrain flow average was 44.15 gpm and a total of 850 gallons of <br />water was excavated from the leak detection system yielding a monthly average of 31.48 gpad. <br />During June the West Pit water treatment plant operated efficiently discharging a total of <br />8,212,400 gallons (25.20 acre-feet) of water to Rito Seco Creek and a total of 1,072,900 gallons <br />(3.29 acre-feet) of water was transferred from the water treatment plant to the tailings <br />impoundment. Seepage along Rito Seco Creek remained dry during the month. <br />P.O. Box 310 San Luis, Colorado 81152-0310 (719) 379-0798 Fax (719) 379-0713 <br />
The URL can be used to link to this page
Your browser does not support the video tag.