My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO23059
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO23059
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:43:44 PM
Creation date
11/20/2007 3:29:48 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
Hydrology
Doc Date
2/21/2006
Doc Name
2005 Stormwater Annual Report
From
Blue Mountain Energy, Inc.
To
WQCD
Permit Index Doc Type
NPDES
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~'TORMWATER ANNUAL REPORT -METAL MINING (& COAL) <br />COLORADO DEPT. OF PUBLIC HEALTH & ENVIRONMENT <br />Water Quality Control Division <br />WQCD-P-B2 <br />4300 Cherry Creek Drive South <br />Denver, Colorado 80246-1530 <br />Make enough copies of form for each reporting year. Check box if this is a <br />new name, address, etc. <br />Pennittee (Company Name): Blue Mountain Enerey, Inc. ^ <br />Facility Name: Deserado Mine ^ <br />Mailing Address: 3607 County Road 65: Rangely, CO 81648 ^ <br />Facility Phone Number: (970) 675-4322 ^ <br />Permit Certification No. COR-04 0 1 7 2 <br />Reporting Period: Jan. 1-Dec. 31, 20 0 5 (Form is due by Feb. 15 of the following year) <br />**Each section must be completed. Please print or type.** <br />A. A report on the facility's overall compliance with the SWMP. (Include here a summary of any measures taken <br />to comply with your Stormwater Management Plan (SWMP), to fully implement it, changes or improvements made <br />in any of your Best Management Practices (BMPs), employee training, spills, other problems encountered, etc. <br />How is your plan working?) <br />See attached (A) <br />Were changes made to your SWMP? ©No ~ Yes -Describe changes on a separate sheet. <br />B. A summary of each comprehensive stormwater facility inspection made, including date, hndinps, and action <br />taken. (The permit requires at least two wmprehensive facility inspections per year -see page 8 of the permit. <br />Include here a summary of those inspections, plus any other comprehensive inspections made. It is not necessary <br />to summarize day-to-day inspections, unless significant problems were noted.) <br />First Inspection -Date _/ /_. Findings, and action taken <br />See attached (B) <br />Note -form maybe reproduced Page 1 of 2 ar6/961t <br />
The URL can be used to link to this page
Your browser does not support the video tag.