My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO23041
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO23041
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:43:43 PM
Creation date
11/20/2007 3:28:47 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
Hydrology
Doc Date
1/24/2001
Doc Name
1st & 2nd Qtr 2001 INSPECTIONS & 2001 ANNUAL CERTIFICATION
From
PEAK PROJECT MANAGEMENT
To
DMG
Permit Index Doc Type
SEDIMENT POND INSPECTIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• BASIN RESOURCES, INC. <br />SEDIMENTATION POND INSPECTION FORM <br />Pond DUu,.J ~~'~ ~t, ~i,~ NPDES No. Da 7 <br />Date of Inspection ] ~ _ <br />EMBANKMENT <br />1. Adequacy of the vegetative cover: Excellent, Mod te: Few, Poor <br />2. Erosion forming gullies: Extensive, Some, ery F None <br />3. Is wave action causing erosion: <br />On the upstream embankment? Yes No~_ <br />At the principal spillway iNe[? Yes Nom. <br />d. Erosion of the dotmstream toe of the embankment? Yes No~_ <br />The cause of the erosion is attributed to: <br />5. Is seepage.occurring through the dam? <br />Could this seepage cause potential instabiliry? <br />• PRINCIPAL SPILLWAY <br />1. Is the principal spillway system in working order? <br />2. Is the inlet free of debris and restrictive material? <br />3. Is [he discharge outlet free of restrictive material? <br />3. Is erosion occurring at the discharge outlet? <br />Evaluate the severin: <br />Extensive Moderate <br />Yes Nom <br />Yes No <br />Yes L No <br />Y'es ~-- No <br />Yes L~ No <br />Yes No t. <br />Just Starting None <br />EMERGENCY SPILLWAY <br />1. Is the overall emergency spillway system capable of passing design storm discharge' <br />Yes _ ('~ No <br />2. Does it appear as S the emergency spilhvay has discharged water since the last inspection? <br />' Yes No ~- <br />3. Is erosion occurring at any section of the emergence spillway? Yes No [-- <br />Describe the extent: <br />SEDIMENT STORAGE CAPACITY <br />1. Has the design storage capacity of the reservoir been surpassed? Yes Na ~/ _ <br />L`yes, explmn: ~.~r r~Jt~ ~S <br />• <br />Please add :tny special comments concerning potentially dangerous pr bl~on the buck of this <br />sheet! <br />Inspected by: <br />
The URL can be used to link to this page
Your browser does not support the video tag.