My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO23041
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO23041
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:43:43 PM
Creation date
11/20/2007 3:28:47 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
Hydrology
Doc Date
1/24/2001
Doc Name
1st & 2nd Qtr 2001 INSPECTIONS & 2001 ANNUAL CERTIFICATION
From
PEAK PROJECT MANAGEMENT
To
DMG
Permit Index Doc Type
SEDIMENT POND INSPECTIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
u <br />~\ <br />LJ <br />Pond /Ve<.v <br />Date of Inspect <br />BASIN RESOURCES, INC. <br />SEDIMENTATION POND INSPECTION FORM <br />NPDES No. ciC' <br />7 cn G <br />Moderate, <br />Some, Few, Poor <br />ry Few None <br />EMBANKMENT <br />1. Adequac}• of the vegetative cover: xcelle , <br />2. Erosion forming gullies: Ea~tensive, <br />3. Is wave action causing erosion: <br />On the upstream embankment? <br />At the principal spilhvay inlet? <br />4. Erosion of the do~vmstream toe of the embankment' <br />The cause of the erosion is attributed to: <br />5. Is seepage occurring through the dam? <br />Could [his seepage cause potential instabilin? <br />E.rzplain: <br />PRINCIPAL SPILLWAY <br />I. Is the principal spilhva}' s}stem m «orking order' <br />2. Is the inlet Gee of debris aid restricti~ a material' <br />Yes No (/ <br />Yes No v <br />Y'es No /~ <br />Yes No <br />Yes No <br />Yes y No <br />Yes ~/ No <br />3. Is the discharee outlet Gee of restrictive material? Yes v No <br />4. Is erosion o-earring at the discharge oudet? Yes No G/ <br />Evaluate the seventy: Enensne Moderate Just Starting None <br />EMERGENCY SPILLWAY <br />1. Is the overall emergency 5pillwav system capable of pazsing design storm discharge? <br />Yes [r No <br />2. Daps it appear as if the emergency spillway has discharged water since the last inspection" <br />Yes No i.r <br />3. Is erosion occurring at any section of the emergency spillway? Yes No ~ <br />Describe the ectent: <br />SEDIMENT STORAGE CAPACITY <br />1. Ilan the design storage capacity of the.reservoir bees surpassed? Yes No <br />S~ee~eeplain: ~/~.i-. l•_l~~ L~a.~ , ,,,- ~ivv0 <br />.~ <br />• Please sad any special comments eooeerning potentially dangerous problem oo the baclt of this <br />sheet! <br />Inspected by: <br />
The URL can be used to link to this page
Your browser does not support the video tag.