My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE52830
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE52830
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:56:28 PM
Creation date
11/20/2007 3:28:09 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001001
IBM Index Class Name
Permit File
Doc Date
1/29/2001
To
MLRB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4• • <br />AND GROUND WATER SUPPLY DRINKING, HOUSEHOLD, LIVESTOCK, WILDLIFE AND <br />AGRICULTURAL NEEDS FOR A LARGE AREA OF MONTEZUMA COUNTY. WE URGE YOU <br />TO CONSIDER THE EFFECTS OF MULTIPLE PITS ALONG THE RIVER, BEFORE DISASTER <br />STRIKES. <br />WITH SPRING MELT-OFF, FLOODING CAN BE SEVERE HERE. SINCE THE TAM PITS AND <br />THE PROPOSED LINE CAMP PIT ARE IN THE FLOOD PLAIN, PIT CAPTURE COULD <br />RADICALLY ALTER THE QUALITY OF OUR WATER AND RIVER AND POSE A SERIOUS <br />THREAT TO PROPERTY DOWN STREAM. <br />THE DOLORES RIVER VALLEY IS A MAJOR RIPARIAN HABITAT. CERTAINLY GRAVEL <br />pTT$ H~gVE A R?.DICA~ EFFECT. HAVE YOU ACCUMUirATED DATA ON THIS ASPECT? <br />YOU ARE THE LEAD AGENCY IN COLORADO. YOUR COORDINATION WITH CWCB, DMG, <br />WQCC, CDOT AND DOW ARE IMPERATIVE IF WE ARE NOT TO DESTROY OUR NATURAL <br />RESOURCES. WHO IS TO ENSURE THIS COLLABORATION? WHO ENSURES STRICT <br />ADHERENCE TO GUIDELINES AND REGULATIONS? <br />HAVE YOU INVESTIGATED THE COST OF RECLAMATION? WE HAVE GOTTEN <br />ESTIMATES OF SEVERAL HUNDRED THOUSAND DOLLARS. A 10,000 DOLLAR BOND <br />LEAVES LITTLE RECOURSE FOR INADEQUATE RESTORATION. <br />IF WE ARE TO PRESERVE THE NATURAL ENVIRONMENT, THE TOURIST AND HUNTING <br />lNDUSTR~S AND R[pAR_jAN HABITATS, DOW GUIDELINES FOR RECLAMATION MUST BE <br />ADOPTED AND REALISTIC BONDING REQUIRED. THE RECLAMATION PERIOD MUST BE <br />SHORTENED AND OPERATIONAL TIME LRvIITED TO ACTIVE EXTRACTION. WE <br />UNDERSTAND THAT EVEN THOUGH A TIME LQvIITED PERMIT IS GRANTED, UNDER <br />CURRENT REGULATIONS A SITE CAN BE UNRECLAIMED FOR MANY YEARS. <br />IT IS IN THE BEST INTERESTS OF THE STATE TO ENSURE THE PRESERVATION AND <br />ECONOMY OF THE SAN JUAN SCENIC SKYWAY. WE HOPE YOU WILL HELP US. <br />~~ ~~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.