My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO23029
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO23029
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:43:43 PM
Creation date
11/20/2007 3:28:04 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
Hydrology
Doc Date
5/9/1994
Doc Name
RATIONALE FOR PUBLIC NOTICE PN CO-0027146
Permit Index Doc Type
NPDES
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PART I <br />Page lh of 19 <br />Permit No. CO-0027146 <br />B. MONITORING REQUIREMENTS <br />4. Acute WET Testine - Outfalls 001. 002. 004 and O15 (continued) <br />If the PTI allows resolution of the WET incident, the TIE need not necessarily <br />be conducted. If, however, WET is not identified or resolved during the PTI, the <br />TIE must be conducted within the allowed 120 day time frame. <br />Any permittee that is required to conduct a PTI/TIE investigation shall do so in <br />conformance with procedures identified in the following documents, or as <br />subsequently updated: 1) Methods for Aquatic Toxicity Identification <br />Evaluations. Phase I Toxicity Characterization Procedures, EPA/600/6-91/003 Feb. <br />91 and 2) Methods for Aquatic Toxicity Identification Evaluations. Phase II <br />Toxicity Identification Procedures, EPA/600/3-88/035 Feb. 1989. <br />A third document in this series is Methods for Aquatic Toxicity Identification <br />Evaluations. Phase III Toxicity Confirmation Procedures, EPA/600/3-88/036 Feb. <br />1989. As indicated by the title, this procedure is intended to confirm that the <br />suspected toxicant is truly the toxicant. This investigation is optional. <br />Within 90 days of the determination of the toxicant or no later than 210 days <br />after demonstration of toxicity, whichever is sooner, a control program is to be <br />developed and received by the Division. The program shall set down a method and <br />procedure for elimination of the toxicity to acceptable levels. <br />(e) Request For Relief <br />The permittee may request relief from further investigation and testing where the <br />toxicant has not been determined and the Division has determined suitable <br />treatment does not appear possible. In requesting such relief, the permittee <br />shall submit material sufficient to establish the following: <br />(i) It has complied with terms and conditions of the permit compliance <br />schedule for the PTI/TIE investigation and other appropriate conditions as <br />may have been required by the Division; <br />(ii) During the period of the toxicity incident it has been in compliance with <br />all other permit conditions, including, in the case of a POTW, <br />pretreatment requirements; <br />(iii) During the period of the toxicity incident it has properly maintained and <br />operated all facilities and systems of treatment and control; and <br />(iv) Despite the circumstances described in paragraphs (i) and (iii) above, the <br />source and/or cause of toxicity could not be located or resolved. <br />If deemed appropriate by the Division, the permit or the compliance schedule may <br />be modified to revise the ongoing monitoring and toxicity investigation <br />requirements to avoid an unproductive expenditure of the permittee's resources, <br />provided that the underlying obligation to eliminate any continuing exceedance <br />of the toxicity limit shall remain. <br />Amendment No. 1 Issued Effective <br />
The URL can be used to link to this page
Your browser does not support the video tag.