Laserfiche WebLink
Mine Aree Seneca fI <br />Project Hydrol ogic Facilities <br />Task Backfill Stock[anks. Remove <br />Flumes. Weather Station <br />NORKSHEET N0. HYD-3 <br />NISLELLANEOUS RECLAMATION ACTIVITIES <br />Description: Backfill and grade 19 stocktanks <br />Equipment: D11N, SU Blade <br />Volume: 19 tanks, 4 hrs per tank <br />Cost: E236.22/hr z 76 hrs = E17. 953 <br />Description: Remove flumes and weather monitoring station <br />Equipment: Backhoe, laborer <br />Volume: 2 flumes <br />Cost: E51.15 backhoe/hr • E17.65 labor/hr x B hrs = 5551 <br /> <br />