Laserfiche WebLink
Mine Area Seneca II • <br />Project Hvdro logic Facilities <br />Task Cr ade Ponds/Ditches <br />NORKSHEET N0. HYD-1 <br />MISCELLANEOUS RECLAMATION ACTIVITIES <br />Description: Backfilling truck cash ponds <br />Equipment: D17N, SU blade <br />Volume: 2 ponds <br />Cost: 8 hrs x 4236.22 = 57.890 <br />Description: Backfilling and gratling all ditches <br />Equipment: 14G Motor Grader <br />Volume: 6000' of ditches <br />Cost: 40 hrs x 583.31 = 53.332 <br /> <br />