Laserfiche WebLink
,- ; <br />~II II~II~II~"~~ II~ <br />E~~A <br />S Coal Company Seneca Coal Company <br />P,FCcI~(FD <br />,IAN 021997 <br />~, {Y pll,li CI iJ1111G'I dl~ a VBUIOQ)~ <br />December 31, 1996 <br />Ms. Erica Crosby <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203-2273 <br />R8: Quarterly Sedimentation Pond Inspections - Seneca II-W Mine <br />Dear Ms. Crosby: <br />Enclosed is the fourth quarter inspection reports for Ponds 005, <br />006, and 009 at the Seneca II-W Mine. Conditions appeared stable <br />and acceptable at ponds 005 and 009. Repairs will need to be <br />completed at the far west end of the slump area in the NE corner <br />of pond 006. The slide has not had any activity in several <br />months. We will review the consultant's report from several <br />years ago on how to proceed with repairing this area in the <br />spring. Per the Division's request, Seneca will be submitting <br />TO-26, the remediation plan for this area in the near future. <br />If you have any questions, please call me. <br />Si <br />~ 29455 <br />MiC G. Al <br />Eng ,®~ring M <br />Enclosure(s) <br />c: Dennis Jones (SCC) <br />Gary Wendt (PWCC) <br />a, P.E. <br />DEC 31 1996 <br />Seneca Coal Company • P.O. Drawer D • Hayden, Colorado 81639 <br />Telephone (970) 276-3707 • FAX (970) 276014 <br />