Laserfiche WebLink
LJ <br /> <br />e) Schedule indicating how and when reclamation will be <br />implemented. <br />(i) (ii) (iii) Estimate of periods of time required for <br />various phases of reclamation, size and location, sequence. <br />Phase Acreage Minim Time Reclamation Completion <br />I 20 year-. ~ years after <br />~ !I mining <br />I I I 1 <br />(f) Description of each of the following_ <br />(1) Final grading. <br />The pit floor will be left flat with a slight pitch to the <br />southeast for positive drainage. The pi_t floor will da ly fight <br />to existing r_ontour_s on the east of Phase I and_the soustL of <br />P ahah ses II & ~III~-~Backslopes will be finished at 3H:1V. <br />(2) Seeding types, mixture, quantities, time of seeding. <br />See (d) above. <br />3) Fertilization type, mixture, qualities and time of ap- <br />plication. <br />A commercial fertilizer mix will be purchased from a local <br />dealer and will contain 40#/A available N ~ F'. Fertilizer <br />will be applied immediately before seeding and mulching. <br />(4) Reveeetation - type of trees, shrubs, etc. <br />Reclamation will be rangeland with no trees. or shrubs pro- <br />posed. <br />l5) Topsoiling_ <br />The ;oils present on the affected areas have topsoils of clay <br />loam to c-ilty clay loam with an average depth of 5". Pit <br />floors and back~;lopes will have an average o~f 4" - 7" of top- <br />soil replaced. <br />