My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO22967
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO22967
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:43:41 PM
Creation date
11/20/2007 3:25:10 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980005
IBM Index Class Name
Hydrology
Doc Date
10/26/2001
Doc Name
3rd Qtr 2001 Inspections
From
SENECA COAL CO
To
DMG
Permit Index Doc Type
SEDIMENT POND INSPECTIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f ~ <br /> <br />PHRIODIC INSPECTION FORM <br />Stockponde or Sumpa <br />INSPECTOR'S NAME:Dennis Bugay DATE: 8/17/2001 <br />FACILITY CONFIGURATION: Stockpond DATE LAST INSPECTION: 3/31/2001 <br />SITE NAME: T-2 LOCATION: SE~tiS W`/„ Se c 2, T5N, R87W <br />MINE NAME: Seneca II LOCATION: 7.1 mi SE of Hayden, CO <br />MINE I.D. NO.: C-80-005 OWNER'S REP.: Gregg Kitchen Gen. Mgr. <br />Circle or write in appropriate reaponae <br />I. Angle of slope: 2:1 upstream, 2.75:1 downstream <br />2. *Seepage (specify location, color, and approximate volume) <br />At isolated points on embankment slopes: <br />At natural hillside: <br />Over widespread areas: <br />From downstream foundation area: <br />"Boils" beneath stream or ponded water: <br />3. Cracks or scarps on crest: _ <br />a. Cracks or scarps on slope: <br />5. Sloughing or bulging on slope: <br />6. *Major erosion problems: <br />7. Surface movements in valley bottom or on hillside: <br />8. *Erosion of toe: _ <br />9. *water impounded against downstream toe: <br />10. Existing embankment freeboard: Approximately <br />11. Increase x Decrease in water level: <br />12. Cracks, bulging, or erosion on upstream face: <br />13. Spillway erosion: <br />1~1. *Clogging <br />Spillway channels: <br />Diversion ditches: <br />Yes ~ N/A <br />Yes o N/A <br />*Major adverse changes in these items could cause instability and should be reported to <br />the Engineering Manager and Mine Superintendent for further evaluation. Adverse <br />conditions noted in these items should normally be described (extent, location, volume, <br />etc.) in the space on the back of this sheet. <br />Total = 4.75:1 N/A <br /> <br />Yes ~ N/A <br />Ye s N~ N/A <br />Yes ~~~ <br />~ N/A <br />Yes N N/A <br /> <br />Yes ~N N/A <br />Yes ~ N/A <br /> <br />Yes ~ N/A <br /> <br />Yes ~ N/A <br /> <br />Yes No N/A <br />Yes No N/A <br /> <br />Yes ~ N/A <br />Yes ~ N/A <br />1.5 feet <br /> feet <br /> <br />Yes o N/A <br />Yes N/A <br />
The URL can be used to link to this page
Your browser does not support the video tag.