Laserfiche WebLink
Page five <br />Letter to Ms. Carol Pahlke <br />and Mr. Tom Pike <br />Re: Kerr North Expansion <br />April 24, 1980 <br />B. General Compliance Measures: KCC will effect <br />applicable hydrologic, revegetation and other appropriate <br />compliance measures at the Kerr tipple consistent with the <br />requirements of 30 C.F.R. Part 827. <br />IV. GEOLOGY <br />A. The geology baseline data for the Kerr Mine area <br />will include a surface geology map, geologic cross sections <br />and a structure map of the permit and adjacent areas. Also <br />included in the geologic information will be a description <br />of overburden physical properties, chemistry and mineralogy. <br />It was confirmed in this connection that marcasite need not <br />be analyzed. See, 30 C.F.R. 779.14(b)(1)(v). KCC will, <br />however, analyze for iron sulfide, sulfate and organic <br />sulfer. <br />We wish to express our gratitude for the coopera- <br />tion shown by representatives of the MLRD and OSM. Again, <br />we would ask you to immediately contact us if any of the <br />matters set forth in this letter are either incorrect or <br />unacceptable to you. <br />MSM:bb <br />cc: Mr. Dean Massey <br />Mr. Jerry 2impfer <br />Mr. Roy Cox <br />Very truly yours, <br />. n Q~ . <br />u~dw` <br />Micha S. McCarthy <br /> <br />