My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE52560
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE52560
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:56:18 PM
Creation date
11/20/2007 3:22:28 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981047A
IBM Index Class Name
Permit File
Doc Date
8/15/2002
Section_Exhibit Name
Exhibit J Other Licenses and Permits
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PART 1 <br />Page No. 7 <br />Pmnit No. COG-850000 <br />B. EFFLUENT LIMITATIONS AND MONITORING REQUIREMENTS <br />• 2. Stormwater Manaeement Plan (SWMPI (continued) <br />c. Erosion and Sediment Controls -Describe BMPs that will be used to reduce erosion and prevent sediment deliveryto State <br />waters. These should include structural (such as silt fences, sediment ponds, drop stmctures, check dams) and non- <br />stmctural (such as mulching and revegetation) methods. <br />Whenever a facility or a portion of a facility enters the Est-minine phase, it is likely that the overall configuration of the <br />site will change considerably. Prior to the time when new vegetation becomes established, the surface azeas will be subject <br />to potentially significant erosion. The pemuttee will need to take adequate measures in order to minimize this erosion as <br />well as the erosion normally encountered during mining activities. <br />d. Identification of Dischazees other than Stormwater -The stormwater conveyance system on the site shall be evaluated for <br />the presence of dischazges other than stormwater, such as mine drainage, spoil springs, sanitary waste, or process water of <br />any kind. The SWMP shall include a description of the results of any evaluation for the presence of dischazges other thast <br />stormwater, the method used, the date of the evaluation, and the on-site drainage points that were directly observed during <br />the evaluation. <br />b) Facility Insoections <br />Qualified personnel identified by the operator shall make a comprehensive inspection of their stormwater management system, at <br />least twice per yeaz (in the spring and fall), except as provided in paragraphs d and e, below. These comprehensive inspections must <br />be documented and sunm~arized in the Annual Report (see Part I.D.2. of the permit). <br />1) Material handling azeas, disturbed azeas, azeas used for material storage that are exposed to precipitation, and other potential <br />sources ofpollution identified in the SWMP in accordance with Part I.B.2.a)1) of this permit shall be inspected for evidence of; <br />or the potential for, pollutants entering the drainage system. Stmctural stotmwater management measures, sediment and control <br />measures, and other structural pollution prevention measures identified in the plan shall be observed to ensure that they aze <br />operating correctly. A visual inspection of equipment needed to implement the plan, such as spill response equipment, shall be <br />made. <br />2) Based on the results of the inspection, the description ofpotential pollutant sources and pollution prevention measures identified <br />in the plan shall be revised as appropriate within two weeks of such inspection. Such revisions shall provide for implementation <br /> of any changes to the plan in a timely manner, but in no case more than 90 days after the inspection. <br />3) A report s~*nn+a~~ing the scope of the inspection, personnel snaking the inspection, the date(s) of the inspection, major <br /> observations relating to the implementation of the SWMP, and actions taken in accordance with paragraph (b), above, shall be <br /> made and retained as part of the S WMP for at least three yeazs. The report shall be signed in accordance with Part I.D.7. of this <br /> permit. <br />4) Where semi-annual site inspections are shown in the plan to be impractical for sites where an employee is not stationed or does <br /> not routinely visit the site, inspections as required in this part shall be conducted at appropriate intervals specified in the plan, <br /> but never less than once in two yeazs. <br />5) Where semi-annual site inspections aze shown in the plan to be impractical for inactive sites (sites where industrial activity is no <br /> longer conducted), site inspections required by this part shall be conducted at appropriate intervals specified in the plan, but, in <br /> no case less than once in three yeazs. At lease one site inspection required under this part shall be conducted before October 1, <br /> 1999, or the date two yeazs afrer such site becomes inactive, whichever is eazlier. <br />c) Additional SWMP Requvements <br />1) Signatory Requirements: A copy of the plan shall be signed in accordance with Part I.D.7. and retained on site. <br />2) SWMP Review/Changes: Upon review ofthe SWMP, the Division may notify the permittee at any time that the plan does not <br /> meet one or more of the minimum requirements of this permit. After such notification, the peratittee shall [Hake changes to the <br /> plan and shall submit [o the Division an update to the plan including the requested changes. Unless otherwise provided by the <br />• Division, the permittee shall have 30 days afrer such notification to both make the necessary changes to the plan and to <br /> implement them. <br />
The URL can be used to link to this page
Your browser does not support the video tag.