Laserfiche WebLink
• stage-discharge relationship of the principal spillway was calculated <br />using SEDIMOT II, while the stage-discharge relationship of the <br />emergency spillway was calculated as a broad crested wier using the <br />Bernoulli equation. Table 5 is a summary of the spillway data. <br />Principal Spillway <br />• <br />• <br />Emergency Spillway <br />TABLE 5 <br />Spillway Data Summary <br />Sediment Pond 001 <br />Type <br />Barrel Diameter <br />Riser Diameter . <br />Length of Barrel . <br />Vertical Head Drop . <br />Entrance Loss Coef. <br />Bend Loss Coef. <br />Wier Coef. <br />Orifice Coef. <br />Manning Coef. <br />Drop Inlet (CMP) <br />6.000-inch <br />12.000-inch <br />110.000-ft <br />2.000-ft <br />1.000 <br />0.500 <br />3.100 <br />0.600 <br />0.025 <br />Type . <br />Bottom Width . <br />Depth <br />Sideslope <br />Manning Coef. <br />Spillway Slope . <br />Spillway Length. . <br />Exit Channel Slope . <br />Exit Channel Length. . <br />Trapezoidal Channel <br />15.000-ft <br />2.000-ft <br />3h:ly <br />0.035 <br />0.000 % <br />27.000-ft <br />16.000 % <br />60.000 <br />The entrance to the emergency spillway is located more than one foot <br />above the principal spillway. There will be no flow through the <br />emergency spillway as a result of the runoff from a 10-year, 24-hour <br />precipitation event or less. <br />REMEDIAL COMPLIANCE PLAN <br />The present storage capacity and spillway configuration of Sediment Pond <br />001 are inadequate. As a result of this, Peabody proposes the following <br />remedial actions be taken pending CMLRD approval: <br />1. Excavate the ponding area to provide the storage capacity <br />shown in Table 4. <br />2. Construction of principal and emergency spillways as shown on <br />Exhibit 13-11. <br />9 <br />