My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE52521
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE52521
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:56:17 PM
Creation date
11/20/2007 3:21:05 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008A
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
NH1 TAB 13 ATTACHMENT B SEDIMENTATION POND 001
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• stage-discharge relationship of the principal spillway was calculated <br />using SEDIMOT II, while the stage-discharge relationship of the <br />emergency spillway was calculated as a broad crested wier using the <br />Bernoulli equation. Table 5 is a summary of the spillway data. <br />Principal Spillway <br />• <br />• <br />Emergency Spillway <br />TABLE 5 <br />Spillway Data Summary <br />Sediment Pond 001 <br />Type <br />Barrel Diameter <br />Riser Diameter . <br />Length of Barrel . <br />Vertical Head Drop . <br />Entrance Loss Coef. <br />Bend Loss Coef. <br />Wier Coef. <br />Orifice Coef. <br />Manning Coef. <br />Drop Inlet (CMP) <br />6.000-inch <br />12.000-inch <br />110.000-ft <br />2.000-ft <br />1.000 <br />0.500 <br />3.100 <br />0.600 <br />0.025 <br />Type . <br />Bottom Width . <br />Depth <br />Sideslope <br />Manning Coef. <br />Spillway Slope . <br />Spillway Length. . <br />Exit Channel Slope . <br />Exit Channel Length. . <br />Trapezoidal Channel <br />15.000-ft <br />2.000-ft <br />3h:ly <br />0.035 <br />0.000 % <br />27.000-ft <br />16.000 % <br />60.000 <br />The entrance to the emergency spillway is located more than one foot <br />above the principal spillway. There will be no flow through the <br />emergency spillway as a result of the runoff from a 10-year, 24-hour <br />precipitation event or less. <br />REMEDIAL COMPLIANCE PLAN <br />The present storage capacity and spillway configuration of Sediment Pond <br />001 are inadequate. As a result of this, Peabody proposes the following <br />remedial actions be taken pending CMLRD approval: <br />1. Excavate the ponding area to provide the storage capacity <br />shown in Table 4. <br />2. Construction of principal and emergency spillways as shown on <br />Exhibit 13-11. <br />9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.