Laserfiche WebLink
EXHIBIT D <br />MINING PLAN <br />The Alma Placer Group Properties are located eas <br />small mountain town of Alma, Colorado. All wean <br />Highway No. 9 runs north-south through the town <br />Exhibit B shows these features on an index map. Tf <br />property parallels or straddles the highway and t'. <br />Platte River for over three miles. The Alma Plac <br />Properties consist of the Alma, Powless, West SI <br />Pratt patented claims for a total of 620 acres. <br />only approximately 160 acres of the Alma Placer are <br />in this permit application. These claims are lc <br />Township 8 South, Range 78 West; Township 9 South, ; <br />West, and Township 9 South, Range 77 West of tl <br />Principle Meridian, Park County, State of Colorado. <br />C, Plate 1 shows the property and permit boundaries. <br />: of the <br />er State <br />~f Alma. <br />e placer <br />~e South <br />er Group <br />lore and <br />However, <br />included <br />Gated in <br />Lange 78 <br />ie Sixth <br />Exhibit <br />The mine will be a gold placer operation for the re overy of <br />gold and associated minerals. If gravel processin becomes <br />economically feasible in the future, gravels may also be <br />developed, but a permit amendment will be request before <br />any commercial gravel operations are undertaken. <br />The applicant requests a permit area for only 160 acres of <br />the entire 620 acres of the claim group. The appli ant has <br />• no plans to mine west of Colorado Highway 9. Am ndments <br />will be submitted at a later date for any other areas beyond <br />the 160 acres. <br />The method for mining the property is divided ii <br />stages; site construction and preparation, minin <br />tions, and Einal abandonment. Each stage of the mil <br />has been designed to minimize environmental deter <br />and to facilitate the reclamation process. A mine <br />map depicting the stages of mining is presented in <br />C, Plate 4. <br />Site Construction and Preparation <br />During this stage of the mining methods, access ro< <br />be upgraded, and the processing plant facilities an <br />ment will be moved on site and constructed. Three ~ <br />access roads from Highway 9 will be improved by gra <br />graveling. These access roads are indicated on Exl <br />Plate 4 as Access A, B and C. Access Roads A and <br />already disturbed areas. Access Road A crosses tl <br />Platte River over already constructed culverts, s <br />culverting will be necessary. Access Road C will i <br />major access until 1987, when topsoil will be stri <br />stockpiled. The road will be graded and gravel <br />realigned path as determined most convenient at t <br />. for South Phase operations. Due to the topography, <br />and drainage ditches should not be necessary. They <br />~o three <br />opera- <br />ing plan <br />oration <br />sequence <br />Exhibit <br />ds will <br />1 equ ip- <br />xisting <br />Sing and <br />ibit C, <br />i are in <br />e South <br />> no new <br />of be a <br />sped and <br />'d in a <br />gat time <br />:ulverts <br />will be <br />5 <br />