Laserfiche WebLink
.e.. <br />6050 <br />LL <br />z <br />°— 6040 <br />r <br />a <br />w <br />J <br />w <br />6030 <br />6020 <br />L E G E N D- <br />CROSS- SECTION 30 <br />A <br />Section /Exhibibt <br />IN <br />i_Type /Seq <br />ss: _: <br />Cla ❑ Report O Hydro OGeneral <br />Doc Type: <br />__—______—_— _____—____ _ _ _ _ _ __________ __ _ _ __ _ <br />DApplication (Coal only) ❑Bond D Enforcement ❑Inspection <br />NOTES: <br />I. ALL CROSS– SECTIONS ARE VIEWED LOOKING <br />DOWNSTREAM. SCE EXHIBIT 21.1.M FOR CROSS – <br />SECTION LOCATIONS. <br />2. CROSS- SECTIONS SURVEYED BY WOODWARD- <br />CLYDE CONSULTANTS. <br />3. RELATIVE ELEVATIONS TAKEN FROM TOPO- <br />GRAPHIC MAP WITH I -INCH EQUALS 500 FEET <br />HORIZONTAL SCALE AND 10-FOOT CONTOUR <br />INTERVAL. <br />IN <br />mined Lana <br />Redamat nr, r: -. -: -)n <br />I ARCO Coal Company 14 01F I <br />Division of Atlantic RichfieldCompany <br />A Eui,re.+fri <br />G— - <br />C <br />NORTH FORK GUNNISON RIVER <br />EXISTING CONDITIONS <br />Prepared by: B.A.L. Scale: EXHIBIT <br />Department :ENVIRONMENTAL SERVICES Date:AUG 1979 <br />2.8.I.M <br />Drawn by: P.S. <br />(' () <br />IIIIII VIII VIII VIII VIII IIII IIII III <br />001695 <br />m <br />— — — STAGE <br />RESULTING <br />FROM <br />100 YEAR FREQUENCY FLOOD <br />- -- — STAGE <br />RESULTING <br />FROM <br />25 YEAR FREQUENCQFLOOD <br />- ---- STAGE <br />RESULTING <br />FROM <br />10 YEAR FREQUENCY�FLOOD <br />STAGE <br />RESULTING <br />FROM <br />AVERAGE ANNUAL FLOW <br />A <br />Section /Exhibibt <br />IN <br />i_Type /Seq <br />ss: _: <br />Cla ❑ Report O Hydro OGeneral <br />Doc Type: <br />__—______—_— _____—____ _ _ _ _ _ __________ __ _ _ __ _ <br />DApplication (Coal only) ❑Bond D Enforcement ❑Inspection <br />NOTES: <br />I. ALL CROSS– SECTIONS ARE VIEWED LOOKING <br />DOWNSTREAM. SCE EXHIBIT 21.1.M FOR CROSS – <br />SECTION LOCATIONS. <br />2. CROSS- SECTIONS SURVEYED BY WOODWARD- <br />CLYDE CONSULTANTS. <br />3. RELATIVE ELEVATIONS TAKEN FROM TOPO- <br />GRAPHIC MAP WITH I -INCH EQUALS 500 FEET <br />HORIZONTAL SCALE AND 10-FOOT CONTOUR <br />INTERVAL. <br />IN <br />mined Lana <br />Redamat nr, r: -. -: -)n <br />I ARCO Coal Company 14 01F I <br />Division of Atlantic RichfieldCompany <br />A Eui,re.+fri <br />G— - <br />C <br />NORTH FORK GUNNISON RIVER <br />EXISTING CONDITIONS <br />Prepared by: B.A.L. Scale: EXHIBIT <br />Department :ENVIRONMENTAL SERVICES Date:AUG 1979 <br />2.8.I.M <br />Drawn by: P.S. <br />(' () <br />IIIIII VIII VIII VIII VIII IIII IIII III <br />001695 <br />