Laserfiche WebLink
' REVISED <br />8/8/85 <br />i - PROFESSIONAL ENGINEERS CERTIFICATION <br />' I, Eldon D. Strid, being a registered professional engineer in the <br />State of Colorado, do hereby certify that Sedimentation Pond E and <br />' associated diversion structures have been constructed based on the <br />hydrologic and hydraulic designs in this report. Previous as built <br />surveys indicate that additional excavation is required to provide <br />sufficient design storage in Sediment Pond E. <br />During late June, 1985, excavation of the southern end of the <br />' impoundment was completed. The as built survey of this work is shown on <br />Fish Creek Tipple Sedimentation Pond E As Built Plan View Map. The <br />excavation allowed for revision (lowering) of the principal spillway <br />' dewatering-hole and top of the riser as shown on Table 4, Sedimentation <br />Pond "E" Riser Pipe Design Calculations. <br />1 O ,: ~' -. <br />~~/j/nom/ ,,, /,}/'/e ~ ... ~~ <br />c' <br />i' <br />Eldon D. Strid, Colorado ~:=16811,,~'..,`,y~ <br />. ,_ ' .~ <br />~~`~ <br />DATE: ~ ~/Y/ 5 <br />i~ <br />II <br />i~ <br />~. <br /> <br />-1- <br />