Laserfiche WebLink
DAd.Y DWRY <br />' 'R0.1ECT Getty Fuels PROJEL7 NO. 83-414 DATE 5-16-83 <br /> CATION South Routt County, CD REPORT NO. 4 TII~ 2.0 hours <br /> -OtJRCE Dam Berm SAMPLE NO. 2 ENGIIVFFR~IING TEC}~YfCL0.2'7 F.W. <br />WORX A~9Fa8 <br />The contractor placed several Feet of fill in the berm since last tested on <br />. 5/13/83. <br /> <br />i~ <br /> <br />' VERBAL iN5'rRUC"TIONS <br />~ ' ~5 Joe Tyburski vas notified of the high moistuze readings in the txo tests <br />taken. <br /> <br /> <br />4E3tARX5 <br />' Two ccmpaction tests were taken on the Northern half of the Sean. There vas <br />not enough nev Eill on the Southern portion of the berm co be tested. <br />' 3oth compaction tests met the required 90Z density called for is the specs. <br /> The aoisture in both tests xere quite high. I chink the high readings could <br /> be atributable co the gauges reaction co small quantities of coal and organics <br />' Eouad is the fiL material. The material appeared to be 3X to 4S over optimum. <br />1 L. <br />1 ~ / <br /> <br />