Laserfiche WebLink
•_ 8) A pressure regulator will be placed in the line near the exit to control flow in the entire pipe. <br />9) During the temporary pipe time frame, the Reeder/Garret/Johnson distribution box will be <br />supplied from an 8" diameter SDR 26 pipe leading from the main pipe. <br />Timing <br />1) Temporary pipe will be laid during sometime in 2001 and will be put into operation either <br />during for the latter part of the irrigation season of 2001 or will be ready for the 2002 season. This <br />will depend on mining advance. <br />2) After mining continues west of 2700 Road and the area for the permanent line has been <br />backfilled and graded, the permanent line can be installed and should be ready for the 2005 <br />irrigation season. <br />As of the Mid Term Review of 2006, the HDPE pipeline was installed as described above and has <br />operated with no significant problems. All ditch users are satisfied with the performance of the <br />pipeline. The location of the pipeline is shown on Map 2.05.3(3)-1 Surface Water Hydrology. Two <br />buried portions also exist, one under the BB detour Road and one under the future restored BB <br />Road and the mine perimeter road. Both of these locations are shown on the Surface Hydrology <br />Map. It is important to note that the CC Company has accepted the pipeline as a permanent <br />structure. The location of the pipeline structure on Map 2.05.3(3)-1 Surface Hydrology is the <br />permanent location. <br />Relocation of Utilities <br />When the mining operation crosses BB Road, the buried phone tine and overhead power line along <br />it will be relocated to the BB Detour Road. The buried phone line and overhead power line along <br />2700 Road will be temporarily located along the Morgan access road located south of the property. <br />Once 2700 Road is restored, the utilities will be restored in this permanent ROW as welt. The <br />phone lines are under the control of Nucla - Naturita Telephone Company and the power line is <br />owned and operated by San Miguel Power Association. The locations of the original utilities, as <br />well as the relocated utilities, are shown on Map 2.05.3(3)-3. The following table summarizes the <br />distances of power and phone lines that were removed and relocated. <br />_~ <br />(ReWsed July 2006) 2.05.3(3)-55 <br />