My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE52395
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE52395
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:56:12 PM
Creation date
11/20/2007 3:18:58 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008A
IBM Index Class Name
Permit File
Doc Date
7/30/2007
Section_Exhibit Name
Section 2.05.3(3) Mine Facilities
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• There will not be any special requirements which will be a part of the restoration of the <br />Sunshine Ranch Corner. This intersection will be restored in the same fashion as the <br /> <br />r 1 <br />adjacent county roads and will be restored to county standards. The only thing special about <br />the restoration of this intersection is that there will be a stop sign in the direction opposing <br />2700 Road (BB Road), which wilt allow 270Q Road to be the main through road. There are no <br />special County requirements for the restoration of this intersection. <br />Table 2.05.3(3)-3 Timing of Road, Ditch and Utility Detours and Restorations <br />Item Description Date <br />1 Leave open slot cut immediately south of BB Road while mining west to <br />eastern edge of 2700 Road End 2000 <br />2 Install BB Road Detour as described in Section 8. Also install power <br />and phone lines along this detour road. Finish by 2nd <br />quarter 2000 <br />3 Mine through BB Road north to West Lateral Ditch. Stockpile asphalt. Mid-2000 <br /> Install West Laterai Ditch Detour Start 2001 <br />5 Install Enstrom, Wilcox, Johnson access road from Morgan road Start 2002 <br />6 Mine through 2700 Road going west. Stockpile asphalt. Mid 2002 <br />7 Place 2700 Road and BB Road in original locations as a gravel surface. <br />Continue using detour. Restore West Lateral Ditch in permanent <br />pipeline location. Mid 2005- <br />Mid 2006 <br />8 Pave 2700 Road and BB Road in original locations and restore <br />Sunshine Ranch Corner intersection. Also lay power and phone lines in <br />original locations. End 2007 <br />9 Remove BB Road detour and reclaim road area End 2007 <br />10 Mine west to last cut at western permit boundary End 2013 <br />11 Backfill final cut with overburden stockpile End 2013 <br />12 Retopsoil and revegetate final cut area Start 2014 <br />13 Replace BB Road from Sunshine Ranch Corner to western boundary. <br />Also re-install power lines and phone lines along road. Start 2014 <br />14 Continue to irrigate and monitor reclaimed areas until final bond <br />release. Many areas will be given back to the original owners, <br />especially irrigated areas, much earlier than the date shown here. Start 2024 <br />(Revised July 2006) 2.05.3(3)-47 <br />
The URL can be used to link to this page
Your browser does not support the video tag.