My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO22855
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO22855
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:43:51 PM
Creation date
11/20/2007 3:18:57 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982057
IBM Index Class Name
Hydrology
Doc Date
7/20/1999
Doc Name
SENECA II-W MINE C-82-057 QTR STOCKPOND INSEPECTIONS
From
SENECA COAL CO
To
DMG
Permit Index Doc Type
SEDIMENT POND INSPECTIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PERIODIC INBPBCTION FORM <br />Btockpoad^ or Buspa <br />INSPECTOR'S NAt~: Michael Altavilla <br />FACILITY CONFIGURATION: Stec Pend <br />SITE NAME: T-3 <br />MINE~NAME: ~ ne a TI-W <br />MINE I.D. NO.: c-82-057 <br />DATE: 06/29/99 <br />DATE LAST INSPECTION: 0324/99 <br />LOCATION: NW3.3F.3~ C_ec 22 TSN. AABW <br />LOCATION: S mi S of Hayden, m <br />OWNER'S REP.: Brad Brawn Gen MQr <br />1. Angle of elope: a_3:1 upstream, 2.9:1 downstream Total = L2a1 N/A <br />2. *Seepage (specify location, color, and approximate volume) <br /> <br /> At isolated points on embankment elopes: Yee ~ N/A <br /> At natural hillside: Yee ~ N/A <br /> Over widespread areas: Yee ~ N/A <br /> From downstream foundation area: Yee Nom N/A <br /> "Boils" beneath stream or ponded water: Yea o N/A <br />3. Cracks or ecarpe on crest: Yee ~ N/A <br />4. Cracks or ecarpe on elope: Yee ~[o N/A <br />5. Sloughing or bulging on elope: Yee ~ N/A <br />6. *Najor erosion problems: Yee ® N/A <br />7. Surface movements in valley bottom or on hillside: Yee ~ N/A <br />8. *EZOeion of toe: Yee N/A <br />9. *Water impounded against downstream toe: Yee N® N/A <br />10. Existing embankment freeboard: ARpreximately 3"7 feet <br />11. Increase Decrease in water level: Ne chanQ ~ feet <br />12. Cracks, bulging, or erosion on upstream face: Yee ~ N/A <br />13. Spillway erosion: Yee N® N/A <br />14. *Clogging <br /> Spillway channels: Yee 101 N/A <br /> Diversion ditcheez Yee C~ N/A <br />*Najor adverse changes in these items could cause instability and should be reported to <br />the Engineering Manager and Mine Superintendent for further evaluation. Adverse <br />conditions noted in these items should normally be described (extent, location, volume, <br />et e.) in the apace on the back of this sheet. <br />
The URL can be used to link to this page
Your browser does not support the video tag.