My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO22851
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO22851
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:43:51 PM
Creation date
11/20/2007 3:18:48 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982057
IBM Index Class Name
Hydrology
Doc Date
10/15/1997
Doc Name
SENECA II-W MINE C-82-057 QUARTERLY STOCKPOND INSPECTIONS
From
SENECA COAL CO
To
DMG
Permit Index Doc Type
SEDIMENT POND INSPECTIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PERIODIC INSPECTION FORM <br />Stockponds or Sumps <br />INSPECTOR'S NAME: Aoy Raro <br />FACILITY CONFIGURATION: Stocknond <br />SITE NAME: T-3 <br />MINE NAME: Seneca II-W <br />MINE I.D. NO.: C-82-057 <br />DATE: 09/25/97 <br />DATE LAST INSPECTION: ~lb_/23~97 <br />LOCATION: NWi,SRSf S c TSN RRBW <br />LOCATION: R mi S of Hayden CO <br />OWNER'S REP.: Rr ad Brown CPn Mg~_ <br />1. Angle of elope: 4.3:1 upstream, downatream <br />2 <br />*Seepage (specify location, color, and approximate volume) <br />At isolated points on embankment elopes: <br />At natural hillside: <br />over widespread areas: <br />From downatream foundation area: <br />"Boils" beneath stream or ponded water: <br />3. Cracks or scarps on crest: <br />4. Cracks or scarps on elope: <br />5 <br />6. <br />7 <br />Sloughing or bulging on slope: <br />*Major erosion problems: <br />Surface movements in valley bottom or on hillside: <br />B. *Erosion of toe: <br />9. *Water impounded against downstream toe: <br />10. Existing embankment freeboard: Anoroximately <br />11. ~_ Increase Decrease in water level: <br />12. Cracks, bulging, or erosion on upstream face: <br />13. Spillway erosion: <br />14. *Clogging <br />Spillway channels: <br />Diversion ditches: <br />Yes o N/A <br />Yee No N/A <br />Yes o NfA <br />Yes o N/A <br />Yes N/A <br />Yes aaa~~~'''~~~ N/A <br />Yea ~ <br />o N/A <br />Yes ~~~ff N/A <br />Yee ~ <br />o NjA <br />Yes ~ N/A <br />Yee ®° N/A <br />Yee ~ N/A <br />3.7 feet <br />3.0 feet <br />Yee ® N/A <br />Yes ~ N/A <br />Yee /Nq[ N/A <br />Yes l/~(~o/ N/A <br />*Major adverse changes in these items could cause instability and should be reported to <br />the Engineering Manager and Mine Superintendent for further evaluation. Adverse <br />conditions noted in these items should normally be described (extent, location, volume, <br />Total = 2,2:1 N/A <br />etc.) in the apace on the back of this sheet. <br />
The URL can be used to link to this page
Your browser does not support the video tag.