Laserfiche WebLink
<br />~I~ I~II~~II~II~~'~I <br />sss <br />E~~A <br />S Coal Company Seneca Coal Company <br />October 15, 1997 <br />Ms. Erica Crosby <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203-2273 <br />RE: Seneca II-W Mine (C-82-057) Quarterly Stockpond Inspections <br />Dear Ms. Crosby: <br />Enclosed are copies of the third quarter Stockpond inspections <br />for those structures at Seneca II-W which have been constructed <br />to date. Inspections for Stockponds T-1, T-2, T-3, T-7, T-22 and <br />T-24 are included. Almost all of the Stockponds are full of <br />sediment, due to the precipitation the mine received in the <br />latter half of September. Stockponds T-7 and T-22 need to be <br />reconstructed since portions of their dam and spillway have <br />washed out completely. Maintenance to these areas will be done <br />as the weather and ground conditions allow in the next few <br />weeks. <br />Should you have any questions, please do not hesitate to call. <br />Si <br />M del G. A4~illa, P.E. <br />En ~,8t:rin ger <br />Enclosure(s) <br />c: Dennis Jones (SCC) <br />Gary Wendt (PWCC) <br />OCT 15 137 <br />Seneca Coal Company • P.O. Drawer D • Hayden, Colorado 81639 <br />Telephone (970) 276-3707 • FAX (970) 276-3014 <br />