Laserfiche WebLink
<br />CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 003 <br />Date : 11/1512001 <br />User : WHE <br /> <br />PermiUjob#: M-1976-020 <br />Abbreviation :none <br />Filename : M020-003 <br />Agency or organization name : DMG <br />Permit or other job action :Bond update <br />Task description :Replace topsoil at 8" depfh over 4.4 acres <br />HOURLY EQUIPMENT COST <br />Cost Breakdown <br />MATERIAL QUANTITIES <br />Initial <br />volume : 4, 756 <br />State :Colorado <br />Gounty : La Plata <br />Site :Thomas Pd <br />Basic machine :Cat OBR - 8SU <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 : 3-shank ripper <br />Ownership cosUhour <br />Operating cosUhour <br />Ripper op. cost/hour <br />Operator cost/hour <br />Total unit cosUhour <br />Utilization <br />$49.50 NA <br />$65.98 100 <br />$0.00 0 <br />$27.99 NA <br />Horsepower: 305 <br />Shift basis : 1 per day <br />Data source: (CRG) <br /> <br /> <br /> <br /> <br />$143.48 Total fleet cosUhour <br />$143.48 <br />Swell Loose <br />LCY factor: NA volume: 4,755 LCY <br />Source of estimated volume : (4.4ac)(43560sf/ac)(0.67'd) = 4, 756 cy <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 200 feet Material consistency : 1.00 (Cat HB) <br />Unadjusted hourly production : 491.9 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1 shifUday) <br />Consolidated stockpile Spoil pile : 0.80 (fnd-rf) <br /> Push gradient : 1.00 (Cat HB) <br />Average push gradient : 0.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 6,675 feet Material weight : 0.90 (Caf HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2 550 Ibs/LCY Net correction : 0.45 <br />Weight description <br />Earth - DN Docked <br />Adjusted unit production : 220.87 LGY/hr <br />Adjusted fleet production 220.87 LCYlhr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 21.53 Hours <br />Unit cost : $0.650 /LCY Total job cost : $3,089 <br />