My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE52345
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE52345
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:56:10 PM
Creation date
11/20/2007 3:18:25 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1976020
IBM Index Class Name
Permit File
Doc Date
11/15/2001
Doc Name
COST SUMMARY FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~ ~~~ ~~~~~~~~~~~~~~~~ • REC <br />CIRCES ..~~. ~~.rrr....rr... ,...aware El~~/Ep <br />COST SUMMARY FORM Vn„ <br />PROJECT IDENTIFICATION <br />Date: 15-Nov-2001 <br />User : WHE <br />Permit or job no. <br />Abbreviation <br />Filename <br />M-~s~s-o2o <br />none <br />M020-000 <br />Division oIIYYrq rats <br />Site :Thomas Pl~ aed Cvola9y <br />State :Colorado <br />County : La Plata <br />Agency or organization name : DMG <br />Permit or job action :Bond update <br /> <br />TASK LIST (DIRECT COSTSI FORM FLEET TASK DIRECT <br />NO. TASK DESCRIPTION USED SIZE HOURS COST <br /> <br />001 -Grade sediment pond and sediment containment ditch dozer 1 4.71 $685 <br /> <br />002 -Rip 8 grade 14.4 acre processing yard, ensure 3 % slopes (or irrigation dozer 1 62.2 $9,167 <br /> <br />003 -Replace topsoil at B" depth over 4.4 acres dozer 1 21.5: $3,089 <br /> <br />004 -Highwall (pit inslopes) reduction from 1 H:1 V to 2H:1 V dozer 1 7.21 $1, 046 <br /> <br />005 -Revegetate 14.4 acres for pasture and transplant cottonwoods along sh ravage 1 14.41 $6,381 <br /> <br />006 -Haul reclamation equipment to and from job sde mobilize 4 3.0. $886 <br /> <br />007 -Remove mist debds, 10'L x 10'W x 5'H @ $0.22Pof NA 1 5.01 $110 <br /> <br /> <br /> <br /> <br /> .r ~ t~ ~ f <br /> <br /> <br /> <br /> <br /> <br /> <br />suarorALS: 118.2: $21,364 <br />includes inflation factor adjustment of <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT <br />NA <br />Liability insurance <br />Performance bond <br />Job superintendent <br />Proft <br />not raqulred (or eqp. operatorserves as super.) <br />TOTAL <br />821,364 <br />1.55 %, of direct total == $331 <br />1.05 % of direct total == $224 <br />NA' NA NA total == NA <br />10.00 % of direct total == $2,136 <br /> TOTAL O d P ~_ $2, 692 <br />CONTRACT AMOUNT (direct + O d P) ~_ $24, 056 <br />PROJECT MANAGEMENT- <br />Engineering work and/or contracVbid preparation : NA NA NA total == NA <br />Reclamation management and/or administration : 5.00 % of cntr. NA total == $1,203 <br />CONTINGENCY- NA' NA total == NA <br />'cronfingencles accounted /oral task level TOTAL INDIRECT COS7= $3,895 <br />TOTAL BOND AMOUNT (direct+ indirect) =_ $25,259 <br />
The URL can be used to link to this page
Your browser does not support the video tag.