Laserfiche WebLink
dl IIIIIIIIIIIIIIII <br />i • <br />/~-~~ ~E%HIBIT B <br />Mining Plan <br />Cooper Pit <br />Existing crush material shown as Area #1 on Exhibit C wi1L <br />serve the area for approximately five (5) years. No removal of <br />material in Area #2 will occur during this time. <br />Area #3 will gradually join the existing pit to the East, <br />forming future Area #5. Material removed from Area #5 will be <br />used as pit run for base material, etc. <br />j Operations will continue as shown on Exhibit C. All slopes <br />will be prepared for reclamation as part of the gravel operation. <br />Two types of excavation will be employed to remove material. <br />During the winter months a crawler-dozer with ripper will be uses <br />to break up the frozen material. A rubber-tire loader will be <br />used year-round to load loose material into 12 yard tandem dump <br />trucks or 6 yard single axle dump trucks, depending on the type cf <br />work being done. <br /> <br /> <br />r <br />e <br />.; <br />!~ <br />