Laserfiche WebLink
HOURLY PRODUCTION: <br />_________________ ~ Job Condition Correction Factors <br />Scraper Cycle Ting I -------------------------------- <br />----------------- ~ Site altitude = 5900 ft. <br />Load = 1.4 min. ~ ----------- <br />-------- ~ Alt. adjustment .. 0.94 <br />Maneuver 8 spread = 0.7 min. ~ Job efficiency ... 0.83 (1sh/d) <br />Travel time (heuL 8 return): ~ Net Correction 0.7802 <br />xeul route <br />Road Length Grade Rolling Total Velocity Travel times <br />seg. 0 (ft) res.(X) res.(X) res.(X) (fpn) (min) <br />1 500 3.00 3.00 6.00 1296 0.56 <br />Haul time = <br />Return route <br />1 500 -3.00 3.00 0.00 2816 <br />0.56 min. <br />0.36 <br />•1st 8 lest seg. adj. for octal./decal. Return tine = 0.36 min. <br />Total Cycle Time 3.02 min. <br />------- ~ Machine Volume <br />Machine Payload ~ -------------- <br />--------------- ~ Struck capacity = 14.00 <br />Material weight = 1600.00 lbs/LCY ~ Heaped capacity = 20.00 <br />Mat. description ------- ~ -- --------- <br />Top Soil ~ <br />____________________________________ I Average = <br />__ 17.00 <br />_________ LCY <br />Rated pay load. ...= 48,000 lbs. ~ Adjusted volume = 17.00 LCY <br />Payload volume...= 30.00 LCY <br />Unadjusted production per scraper or push-pull pair 338.12 LCY/hr <br />Adjusted production ............... ..................: 263.80 LCY/hr <br />Adjusted hourly fleet production .. ..................: 263.80 LCY/hr <br />JOB COST: <br />Fleet size 1 Scraper(s) Total Job Time: 7.42 <br />------ Hours <br />------- <br />Unit Cost 50.449 /LCY -- <br />Total Job Cost: --- <br />f879 <br />