Laserfiche WebLink
QUARTERLY POND INSPECTION REPORT <br />THE PITTSBURG & MIDWAY COAL MINING CO. <br />EDNA MINE <br />Pond Identification: CHECK DAM #9 <br />Type Of Pond: EARTHEN CHECK DAM STRUCTURE <br />Operational Status At Time of Inspection <br />Approximate Water Level: 0.2 feet below discharge elevation <br />Sediment Level (%) Total Storage: Estimated 85% full <br />Outflow (cfs): 0 <br />Features <br />Status <br />Comments <br />Erosional: <br />Rills & Gullies On Embankment 1 See Below <br />Vegetation OK <br />Outlet Channels OK <br />Other N/A <br />Pond Structure: <br />Settling OK <br />Cracks Or Slides OK <br />Seepage OK <br />Other N/A <br />Appurtenant Structures: <br />Primary Spillway 2 See Below <br />Secondary Spillway N/A No Secondary Spillway <br />Other N/A <br />Additional Comments: <br />1. Restore embankment at bypass of spillway. <br />2. Spillway should be restored to general trapezoid shape. Large rocks at inlet of spillway should be <br />removed and/or rearranged. Fabric in spi llway should be covered with small (1' or less dia.) rock, <br />minimizing disturbance to established gra ss. <br />Structure is functioning as designed. <br />Field Inspec <br />' Engineer: <br />1 i 589 <br />~o :f0-S -~. ~~~ <br />~~sS~NNAI ~~\ <br />Inspection Date: September 21, 2005 <br />