Laserfiche WebLink
C <br />Rankle W. Case fl <br />February 13, 2003 <br />Page <br />10. Should this substitute water supply plan expire without renewal or be revoked prior to <br />adjudication of a permanent plan for augmentation, all use of the well must cease <br />immediately. , <br />11. Approval of this substitute supply plan does not imply a position by this office on any <br />related litigation, such as the plan for augmentation in case no. 02CW 131. <br />12. In accordance with amendments to Section 25-8-202-(7), C.R.S. and "Senate Bill 89- <br />181 Rules and Regulations" adopted on February 4, 1992, the State Engineer shall <br />determine whether or not the substitute supply is of a quality to meet requirements of <br />use to senior appropriators. As such, water quality data or analysis may be requested <br />at any time to determine if the water quality is appropriate for downstream water users. <br />13. Acceptance of these conditions shall be assumed unless a letter to the contrary is <br />received by this office, the Division Engineer (310 E. Abriendo, Suite B, Pueblo CO <br />81004), and the Water Commissioner (Charlie Judge, P.O. Box 100, Wetmore, CO <br />81253) within twa weeks of your receipt of this letter. <br />Should you have any questions, please contact Keith Vander Horst of this office or Brian <br />Boughton, Augmentation Coordinator, in our Division Z office in Pueblo at (719) 542-3368. <br />Sincerely, <br />~~~~~ ~~ <br />Kenneth W, Knox <br />Chief Deputy State Engineer <br />Attachment: Table 1 <br />cc: Steven J. Witte, Division 2 Engineer <br />Gharlie Judge, Water Commissioner <br />l/~~-DMG, Permit No. M-97-t)54~ <br />KW K/KVH:parkdale-gravel-2003.doc <br />RECEIVED <br />FEB 2 4 2003 <br />Division of Minerals and GeoloBY <br />